Foshan ABD Equipment Co., Ltd.
                                                                                                           
Verified Supplier
23 Years
Since 2003
Menu

OEM Automated Powder Coating System 380V/220V with Pre-Treatment | 295m Chain, 200kg Capacity

Price Negotiable
Price: Negotiate
MOQ: Negotiable
Delivery Time: Negotiable
Brand: ABD
Product Description
Automated Powder Coating System Overview
This industrial-grade automated powder coating line is engineered for professional coating service providers, featuring comprehensive pre-treatment, coating, and curing capabilities for high-volume production environments.
Production Process Flow
Complete automated workflow: Loading → Spray Pre-treatment → Water Drying → Automatic Powder Coating → Automatic Curing → Cooling → Unloading
System Specifications
Chain Conveyor System
  • Dual driving system with 2 tensioning mechanisms
  • Chain capacity: 100kg per single point
  • Adjustable chain speed: 2.5m/min standard
  • Total chain length: 295 meters
Pre-treatment System
Stainless steel SUS 304 spray-type system with 7-stage process:
  • Pre-degreasing
  • Degreasing
  • Water washing 1
  • Pure water washing 2
  • Nano ceramic treatment
  • Water washing 1
  • Pure water washing 2
Drying & Curing Ovens
  • Water drying oven: 120°C operating temperature
  • Powder curing oven: 180-230°C adjustable temperature range
  • Curing duration: 20-30 minutes customizable
Powder Coating Booth
  • Cyclone powder recovery system with 99.5% efficiency
  • PP material construction for quick color changes (15 minutes)
  • 2 automatic reciprocators with automatic guns
  • 2 manual workstations for complex geometries
Technical Specifications
Parameter Specification
Work Piece Compatibility Fridge, air conditioner, automotive parts, etc.
Maximum Work Piece Size 2500×800×2000mm (L×W×H)
Front Door Opening 2400×2440mm (W×H)
Maximum Weight per Hanger 200kg
Water Drying Oven Size 30000×1550×6650mm (L×W×H)
Powder Coating Booth Size 7000×2000×3350mm (L×W×H)
Curing Oven Size 30000×4850×6650mm (L×W×H)
Heating System Natural gas burners: 430,000 kcal/h (drying), 2×600,000 kcal/h (curing)
Customization Options
System configurations can be tailored based on your specific requirements, including alternative pre-treatment methods (tank immersion, semi-automatic spray, shot blasting) and factory layout constraints.
Manufacturer Advantages
  • 9+ years specialized experience in powder coating equipment manufacturing
  • Export operations to 40+ countries worldwide
  • Pre-installation verification before final payment
  • Professional engineering support and after-sales service
  • Custom design capabilities for specific application requirements
  • On-site project demonstrations available for customer inspection
  • Overseas installation support by qualified engineers
Service & Support
12-month warranty on powder coating booth components with lifetime technical support. Delivery timeframe: approximately 50 working days after deposit receipt.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Foshan ABD Equipment Co., Ltd.
Location F5-2 ,North Fanhu District ,Leping Central Sanshui Foshan City ,Guangdong Province ,China
Contact Person Echo

Request A Quote

Please check your email address.
Your message must be at least 20 characters.