MDF UV Coating Line & LPG Tank Powder Coating System with 295m Chain, 200kg Capacity, and 99.5% Powder Recovery
Price:
Negotiate
MOQ:
1 set
Delivery Time:
Negotiable
Brand:
ABD
Product Description
Complete Coating Line System Overview
Working Process Explanation
Automatic Chain System
- 2 sets driving system and 2 tensioning system
- Chain capacity: 100kg per single point
- Chain speed: 2.5m/min (adjustable according to requirements)
- Total chain length: 295m
Pre-treatment System
- Material: Stainless steel SUS 304
- Spray type configuration
- Process steps: Pre-degreasing → Degreasing → Water washing 1 → Pure water washing 2 → Nano ceramic → Water washing 1 → Pure water washing 2
Automatic Water Drying Oven
- Operating temperature: 120°C
Automatic Powder Coating Booth
- Cyclone system recycles 99.5% of powder
- PP material construction
- Color change capability: 15 minutes
- Automatic powder coating with reciprocators and automatic guns
- 2 manual working stations for hard-to-reach areas
Automatic Powder Curing Oven
- Operating temperature: 180-230°C
- Curing time: 20-30 minutes (adjustable)
Technical Specifications
| Work Piece Specifications | |
|---|---|
| Work piece name | Fridge, air conditioner, car parts and similar industrial components |
| Work piece max size | 2500×800×2000mm (L×W×H) |
| Front door size | 2400×2440mm (W×H) |
| Max weight per hanger | 200kg/hanger |
| Water Drying Oven | |
|---|---|
| Size | 30000×1550×6650mm (L×W×H) |
| Material | 100mm rock wool panel for 120°C operation |
| Heating system | 1 set natural gas burner, 430,000kcal/h, with 1 set 7.5kW high temperature fan |
| Powder Coating Booth | |
|---|---|
| Size | 7000×2000×3350mm (L×W×H) |
| Powder recycle system | One cyclone system, 1 set 30kW circulation fan, 24 filter cartridges, 2 automatic reciprocators, automatic guns, manual powder coating guns |
| Automatic Powder Oven | |
|---|---|
| Size | 30000×4850×6650mm (L×W×H) |
| Material | 150mm rock wool panel for 180-230°C operation |
| Heating system | 2 sets natural gas burners, 600,000kcal/h each, with 1 set 15kW high temperature fan |
Frequently Asked Questions
Q1. Are you a factory? Can I go to the factory for inspection?
We have three production and processing factories established for over ten years. We welcome customers for factory inspections and visits.
Q2. What if we won't install it?
We provide professional installation engineers and can send translators to assist with language barriers.
Q3. Our venue is small and do not know how to solve it?
Our technical team can provide customized solutions tailored to your specific space constraints and requirements.
Q4. What kind of Powder Coating machine you can supply?
We offer customized design solutions for all sizes of work pieces and production requirements.
Q5. How about the delivery time?
The paint booth requires approximately 30 working days from design to production completion.
Q6. How to pay the deposit?
We typically conduct international trade by T/T: 30% T/T for deposit, 70% T/T for balance payment.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Foshan ABD Equipment Co., Ltd.
Location
F5-2 ,North Fanhu District ,Leping Central Sanshui Foshan City ,Guangdong Province ,China
Contact Person
Echo