PP Plate Cooling Tower Mist Eliminator Cooling Tower Drift Water Receive
Price:
$1-2/ meters
MOQ:
100 meters
Delivery Time:
10 working days
Brand:
XL
Product Description
PP plate drift eliminator demister pad mist eliminator for cooling tower Water Receive
Air inlet louver advantages:
1. Significantly block sunlight to reduce algae growth on interior surfaces of the cooling tower system, thus reducing the cost of algae-removal chemicals and labor.
2. Reduces noise leaving the tower through the louver modules by approximately three decibels.
3. Achieves very low pressure drop results.
4. Assembled modules available in a variety of lengths.
5. Optional assembly frames made of extruded PVC available for easy installation and access for cleaning and maintenance.
6. Rigid, UV-stabilized PVC
| Tech Date | |
| Sheet Width(mm) | 150mm |
| Sheet Length | 1200mm/customized |
| Thickness | 0.5-0.6mm/customized |
| Sheet Spacing | 12mm |
| Color | grey/black |





Related Blade Drift Eliminator

PACKING AND DELIVERY
Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.
Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.
If you have other questions, please feel free to contact us as below:

Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Wuxi Xianglong Plastic Technology Co., Ltd.
Location
Zhounan Road,Wanshi Town,Yixing City,Wuxi,Jiangsu Province
Contact Person
Yaling


