Wuxi Xianglong Plastic Technology Co., Ltd.
                                                                                                           
Verified Supplier
12 Years
Since 2014
Menu

Water Cooling Tower Film Fill 750/730/930/950mm PVC Filling Cooling Tower

Price Negotiable
Price: $1.2-2/square meters
MOQ: 10 square meters
Delivery Time: 10 working days
Brand: XL
Product Description

Water cooling tower fill media PVC filling cooling tower

Description:

The type cooling tower filler is made from PVC injection molding under high pressure,it has special structure form ,not only certain stiffness,but some flexibility. Due to good elasticity,the filler would chatter under the water-drop impact effect lead to some water-drop rebound to above for the water redistribution.

 

Prolong the residence time in the water in the packing,For heat and mass transfer, thereby increasing the, improved the packing heat dissipation effect.

 


Specifications:
 
Tech Date  
Sheet Width(mm) 730/750/930/950mm
Sheet Length 2000/1800/customized
Thickness 0.32-0.6mm/customized
Sheet Spacing 19-20mm
Color grey/white/black
Material PP/PVC/CPVC

 

Water cooling tower fill media PVC filling cooling tower

Cooling tower fill manufactured from rigid PVC sheets conforming for cooling tower heat-transfer applications. The media is fabricated from corrugated PVC sheets that are solvent-welded for maximum strength and resistant to UV, rot, fungus, organic and inorganic solvents, acids, alkalis and chemicals normally found in cooling tower waters. Available in various mil thickness and heights, especially designed to meet the distinct needs of your particular application, whether that is new construction,emergency repair, thermal upgrade or reconstruction.

Related Cooling Tower Film Fill

 

RELATED PRODUCTS

 

 

Supply in industry

Cooling tower packing cleaning method:

 

1. Manual cleaning of the slag falling off in the cooling tower;

 

2. Rinse the packing repeatedly with a high-pressure water gun to remove the sludge and scale under cleaning;

 

3. Dissolve the TNB descaling agent with hot water at about 50°C, and then use the flushing pump to rinse the filler repeatedly until the scale is rinsed off (if the filler has a long service life, causing aging and collapse, it is recommended to replace the filler), and add algaecide at the same time. Completely kill biological algae and;

 

4. After confirming that all parts of the system are cleaned, drain the sewage;

 

5. Rinse the packing and the inside and outside of the tower body with clean water;

 

6. Restore all parts of the system, replenish water and use it;

 

7. After all recovery, please check and accept the management personnel of Party A;

 

8. Evacuate Party B's belongings and clean the site;

 

PACKING AND DELIVERY

 

About US

 

 

 

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Wuxi Xianglong Plastic Technology Co., Ltd.
Location Zhounan Road,Wanshi Town,Yixing City,Wuxi,Jiangsu Province
Contact Person Yaling

Request A Quote

Please check your email address.
Your message must be at least 20 characters.