Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu

K4C Gasket Repair Kit MM408-468 For Mitsubishi Engine

Price Negotiable
Price: Looking forward to your inquiry
MOQ: 1 set
Delivery Time: 2-5 work days
Brand: HDPARTS
Product Description

K4C Gasket Repair kit MM408-468 Suitable For Mitsubishi Engine

 

 

Applicable models

K4C

Product Name

Gasket Repair kit

Original number

MM408-468

 

 

Product Features

 

Overhaul package K4C is a commonly used building material, also known as "overhaul brick", which has the following characteristics:

 

Material: The overhaul package K4C is generally made of raw materials such as cement, stone powder, coal ash, and gypsum. Compared with K3D, K3G, and K3M, K4C has a higher content of stone powder, making it more lightweight.

 

Shape: The size of the overhaul package K4C is 240mm × 115mm × 52.5mm, in a rectangular shape, the same size as K3M.

 

Scope of application: Overhaul package K4C is suitable for internal and external walls, floors, and other parts of buildings. Its surface is flat and colorful, and can achieve good waterproof, fireproof, anti-corrosion, and thermal insulation effects.

 

Installation method: Overhaul package K4C can be installed using dry or wet hanging methods. When wet hanging, cement mortar needs to be used to fix the bricks on the wall.

 

Applicable environment: The overhaul package K4C is suitable for various climatic environments, with good wind, seismic, and frost resistance performance, and can meet the building needs of different regions.

 

Compared with K3D, K3G, and K3M, K4C has a higher content of stone powder, making it lighter and can reduce the weight of buildings, while also having a certain degree of insulation effect. In terms of durability, K4C may be slightly inferior to K3D, K3G, and K3M. Therefore, when selecting building materials, it is necessary to comprehensively consider the actual needs and environmental conditions.

 

Related product keywords

 

front lower motor mount

 

volvo xc90 engine mount

 

s40 engine mount

 

lower engine gasket set

 

upper gasket kit

 

right engine mount

 

rocker valve cover

 

volvo oil seal

 

Company Information

 

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.


At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.​


is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.


covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.


Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.


The product matching different kinds of excavator spare parts, which caters to the current market demand for high.

 

RODUCT CATEGORIES

1570502302971052897

 

 

 

Packaging & Shipping

 

Packaging material:Plastic, carton, wooden box

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

 

Forklift Engine Packaging & Shipping

FAQ

Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring, cylinder liner, crankshaft.

Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.

Q: How to place orders?
A :The order is from your inqiuries.

  1. Confrim PI (the engine model, price, quantity, packing, delivery time, shipping way, time of payment).

  2. You make payment and send us receipt of payment.

  3. We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

  4. We would deliver goods after we get balance from you. The order finish when you get goods and feel satisfied.

Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.

Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade Assurance,Wire transfer, Western union, Paypal, Cash. (The production order can be pay 30% deposit first, after we arranged well, then you pay the balance.)

Q: Could you give guarantee ?
A:Yes, one year warranty.

Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or our own trademark packing.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Location Shop 1215/1216/1217/1218/1219, No. 36 Zhuji Road, Zhuji International Machinery City, Zhuji Street, Tianhe District, Guangzhou City, Guangdong Province
Contact Person yang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.