Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu

FD46 without pressurization and internal cooling Engine Pistion 12010-0T311 For Nissan

Price Negotiable
Price: Looking forward to your inquiry
MOQ: 1 set
Delivery Time: 2-5 work days
Brand: HDPARTS
Product Description

FD46 without pressurization and internal cooling Engine Pistion 12010-0T311 For Nissan

 

Applicable models

FD46 without pressurization and internal cooling

Product Name

Pistion

Original number

12010-0T311

 

Product Features

Piston FD46 is a common engine piston model commonly used in diesel engines or internal combustion engines. Based on the information you provided, the characteristics of piston FD46 are as follows:

 

No boost design: The piston FD46 does not have a boost function. This means that it is suitable for engines without a turbocharged system and does not have the ability to increase intake pressure through turbochargers (such as turbochargers) to improve engine performance.

 

No internal cooling design: The piston FD46 does not have internal cooling function. Internal cooling refers to the cooling channel at the top or bottom of the piston, used to reduce piston temperature by circulating coolant. The piston FD46 without internal cooling design may rely on other cooling systems (such as cooling water or engine oil) to control the piston temperature.

 

Material: The piston FD46 is usually made of high-strength aluminum alloy, which has good wear resistance and lightweight characteristics.

 

Size and Geometry: The size and geometry of piston FD46 will be determined based on specific engine design requirements, including piston diameter, piston top protrusion shape, position and size of piston rod hole, etc.

 

Sealing ring: The piston FD46 is usually equipped with a sealing ring to ensure the sealing of the cylinder and control the consumption and discharge of lubricating oil.

Related product keywords

 

diesel powered water pump

 

nissan oil cooler

 

isuzu oil cooler

 

volvo engine oil cooler

 

mitsubishi oil cooler

 

komatsu oil cooler

 

cylinder repair kit

 

front crankshaft seal

 

 

Company Information

 

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.


At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.​


is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.


covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.


Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.


The product matching different kinds of excavator spare parts, which caters to the current market demand for high.

 

RODUCT CATEGORIES

1570502302971052897

 

 

 

Packaging & Shipping

 

Packaging material:Plastic, carton, wooden box

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

 

Forklift Engine Packaging & Shipping

FAQ

Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring, cylinder liner, crankshaft.

Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.

Q: How to place orders?
A :The order is from your inqiuries.

  1. Confrim PI (the engine model, price, quantity, packing, delivery time, shipping way, time of payment).

  2. You make payment and send us receipt of payment.

  3. We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

  4. We would deliver goods after we get balance from you. The order finish when you get goods and feel satisfied.

Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.

Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade Assurance,Wire transfer, Western union, Paypal, Cash. (The production order can be pay 30% deposit first, after we arranged well, then you pay the balance.)

Q: Could you give guarantee ?
A:Yes, one year warranty.

Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or our own trademark packing.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Location Shop 1215/1216/1217/1218/1219, No. 36 Zhuji Road, Zhuji International Machinery City, Zhuji Street, Tianhe District, Guangzhou City, Guangdong Province
Contact Person yang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.