Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu

S4Q2 Excavators Engine Oil Pump 32C35-01021 For MITSUBISHI

Price Negotiable
Price: Looking forward to your inquiry
MOQ: 1 pc
Delivery Time: 2-5 work days
Brand: HDPARTS
Product Description

Specification

Applicable models S4Q2
Type Oil pump
Original number 32C35-01021
Warranty 6 months
Engine Type  Diesel
Brand Name  HDPARTS
Condition  New
Size  OEM Size

 

mechanical principle

Oil suction and pressure

The suction and pressure of the fuel injection pump are completed by the reciprocating motion of the plunger in the plunger sleeve. When the plunger is in the lower position, the two oil holes on the plunger sleeve are opened, the inner cavity of the plunger sleeve is connected with the oil passage in the pump body, and the oil chamber is rapidly filled with fuel. When the cam is pushed onto the roller of the roller body, the plunger rises

Oil volume regulation In order to meet the requirements of diesel engine load, the fuel delivery of the fuel injection pump must be able to be adjusted within the range of maximum fuel delivery (full load) to zero fuel delivery (shutdown).

 

 

 
Product Description

 

Guangzhou Hdparts Co., Ltd.
Founded in 1995, we are a company specializing in engine parts for construction machinery (excavators, loaders, bulldozers, heavy trucks, forklifts and other series of construction machinery). Main cylinder block, cylinder head, crankshaft, overhaul kit,piston, cylinder liner, piston ring, size tile, camshaft, connecting rod, oil pump, water pump, valve series products, movement,side,cover,Supercharger, starter motor, alternator, oil nozzle, copper sleeve of oil nozzle, engine gear, etc. cover almost allparts of the entire engine.

PRODUCT CATEGORIES  

1570502302971052897

 

 

 

PACKAGE:

 

Neutral packing / Our own trademark packing / Your brand OEM packing / Packing according to your requirements.

 

DELIVERY TIME:

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

Forklift Engine 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Location Shop 1215/1216/1217/1218/1219, No. 36 Zhuji Road, Zhuji International Machinery City, Zhuji Street, Tianhe District, Guangzhou City, Guangdong Province
Contact Person yang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.