Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu

B3.3 Connecting Rod 4993823 Diesel Engines Parts For CUMMINS

Price Negotiable
Price: Looking forward to your inquiry
MOQ: 1 pc
Delivery Time: 2-5 work days
Brand: HDPARTS
Product Description

B3.3 Connecting Rod 4993823 Suitable For CUMMINS Diesel Engines Parts

 

Main damage forms

      The main damage forms of connecting rod are fatigue fracture and excessive deformation. Generally, the fatigue fracture occurs in three high stress regions on the connecting rod. The working conditions of the connecting rod require the connecting rod to have high strength and fatigue resistance; And it is required to have sufficient rigidity and toughness

Structure composition        The connecting rod body is composed of three parts, and the part connected with the piston pin is called the connecting rod small end; The part connected with the crankshaft is called the big end of the connecting rod, and the rod connecting the small end and the big end is called the connecting rod body.

 

Product Description

 
 

 

RODUCT CATEGORIES

1570502302971052897

 

 

 

Packaging & Shipping

 

Packaging material:Plastic, carton, wooden box

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

 

Forklift Engine Packaging & Shipping

FAQ

Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring, cylinder liner, crankshaft.

Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.

Q: How to place orders?
A :The order is from your inqiuries.

  1. Confrim PI (the engine model, price, quantity, packing, delivery time, shipping way, time of payment).

  2. You make payment and send us receipt of payment.

  3. We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

  4. We would deliver goods after we get balance from you. The order finish when you get goods and feel satisfied.

Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.

Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade Assurance,Wire transfer, Western union, Paypal, Cash. (The production order can be pay 30% deposit first, after we arranged well, then you pay the balance.)

Q: Could you give guarantee ?
A:Yes, one year warranty.

Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or our own trademark packing.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Location Shop 1215/1216/1217/1218/1219, No. 36 Zhuji Road, Zhuji International Machinery City, Zhuji Street, Tianhe District, Guangzhou City, Guangdong Province
Contact Person yang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.