185Kw Small Sand Making Machine
High Quality Rotor Hammer Sand Make Machine Hammer Crusher, 185Kw 160 TPH Small Sand Making Machine Double Rotor Hammer Crusher, limestone hammer crusher, concrete crusher

The main working part of hammer crusher is rotors with hammer. The rotors consist of main shaft, disk, pin shaft and hammers. The motor drives the rotors to rotate quickly in the crushing cavity. Raw materials enter the crusher through the feed opening and are stricken, impacted, cut and ground by the high-speed hammer to small size. There is a screening plate under the rotor, so that materials with size smaller than the screen mesh will be screened out and others are left to be further hammered and ground until reach the standard size. The size of the final product can be adjusted by changing the screening plate. The gap between the rotors and the screening plate can also be adjusted according to different requirement.
| Model | Rotor speed (r/min) |
Feeding size (mm) |
Discharging size (mm) |
Capacity (t/h) |
Power (Kw) |
Weight (t) |
| PC400×300 | 1200 | ≤80 | ≤10 | 3-10 | 11 | 0.7 |
| PC600×400 | 1000 | ≤110 | ≤15 | 10-15 | 22 | 1.5 |
| PC800×600 | 980 | ≤120 | ≤15 | 20-25 | 55 | 3.7 |
| PC1000×800 | 980 | ≤200 | ≤45 | 34-54 | 110 | 6.9 |
| PC1000×1000 | 1000 | ≤200 | ≤15 | 40-60 | 132 | 8.5 |
| PC1200×1000 | 745 | ≤200 | ≤25 | 75-150 | 160 | 12.5 |
| PC1200×1200 | 745 | ≤200 | ≤20 | 80-160 | 185 | 14.3 |
| PC1400×1400 | 750 | ≤250 | ≤20 | 120-170 | 280 | 17.2 |
| PC1600×1600 | 500 | ≤350 | ≤20 | 220-290 | 500 | 32.4 |
| PCH600×400 | 970 | ≤200 | ≤30 | 22-33 | 15 | 1.7 |
| PCH600×600 | 980 | ≤200 | ≤30 | 30-60 | 30 | 2.4 |
| PCH800×800 | 825 | ≤300 | ≤30 | 75-105 | 45 | 4.8 |
| PCH1000×1000 | 740 | ≤300 | ≤30 | 90-150 | 90 | 7.5 |





Questions & Answers
1. How long is the delivery time of your product?
The delivery time is within 20 working days.
2. What is the payment term?
The payment term is T/T.
3.How long is the product warranty period?
Our warranty period is 1 year, excluding wearing parts.
4.What's the after sale service of your company?
We will provide foundation drawing to the clients for installation. Besides, we can provide guidance service for installation and operation of workers, etc.
5. Can your company provide wearing parts?
We can deliver you the spare parts within 10 working days after your order. If your equipment are not manufactured by our company, please provide us the wearing parts drawing or number.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
