CHANGZHOU UNITED WIN PACK CO.,LTD
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

Automatic 1000mm Adhesive BOPP Coating Machine

Price Negotiable
Price: USD
MOQ: 1 set
Delivery Time: Negotiable
Brand: UNITED WIN
Product Description

Automatic 1000mm Adhesive BOPP Coating Machine

 

* Equip with high precision automatic rectifying device to make the collection even.
* Automatic gluing system equips with high precision gluing roll and control block will make the glue apply evenly, and 11save glue
*Anti-explosion and high temperature resistance thermal cycling system, make the same temperature in each position.
* Equips with 4 rolls for final product collection, up and down roll will dislocate to collect the rolls, which improves the 11work efficiency.
* Equips with high precision and wearproof pneumatic shaft for collection roll, it will very easy to control the frictional 1FForce between collection roll and type core.
* Equips with Teflon knurling roll, which will keep a good viscidity for the type.
* All the doctor roll, gluing roll, film delivery roll are all pneumatic controlled.
* The oven door is on the flank, which is convenient for the oven maintenance
* Equips with automatic tube cutting machine and tube load and unload machine.
* Double adhesive type making is option.
* Printing is an option for the machine

 

Technical Parameters:

Model UW500 UW1000 UW1300 UW1600
Effective width 600millimeter 1100millimeter 1400millimeter 1700millimeter
Mechanical speed 5-180m/minute 5-200m/minute 50-300m/minute 50-300m/minute
Glue uniformity ±0.001 millimeter
Rolling flatness ±1 millimeter
Heating method Hot stove/Electricity/Heat transfer oil/Steam
Oven length Can be customized according to needs
Power supply 380V 50HZ
Gas source 5-7kgcm2

 

Application:

This coating machine is suitable for the BOPP sealing tape.

 

FAQ:

1. How long will your engineer reach our factory?

Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)

 

2. How many days will you finish installing?

We will finish installation and training within 15 days.

 

3. What should we charge for your engineer?

You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.

 

4. How long is your machine's warranty period?

All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.

 

5. How could you do if the parts broken within warranty?

We would express the free replacement parts during the warranty date

 

6. How could you do after one year warranty period?

We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.

 

7. What is your terms of payment ?

30% T/T in advance ,balance before shipment.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHANGZHOU UNITED WIN PACK CO.,LTD
Location 16A-103, Jintong International Industrial Park, Wujin National High-tech Zone, Changzhou City, Jiangsu Province, China
Contact Person James

Request A Quote

Please check your email address.
Your message must be at least 20 characters.