Metal Stamping Base Galvanized Stamping Parts Carbon steel SPTE SECC
Metal Stamping Base Factory Customized Galvanizing Stamping Parts Custom Stainless
1 Application fields of metal stamping parts
Home appliance parts stamping factory. These factories only appeared after the development of household
appliances in my country, and most of them are distributed in household appliance enterprises.
Special stamping enterprises. For example, the stamping of aviation parts belongs to this type of enterprise,
but these process factories are also classified as large factories.
2 Technical Parameters
| Product name | Metal Stamping Base Factory Customized Galvanizing Stamping Parts Custom Stainless |
| Name | Metal Stamping Service Welding Aluminum Sheet Metal Sheet Metal Stamping Bending Fabrication |
| Color | Blue |
| After sale service | Offer best service |
| Thickness | 6mm-20mm, Various |
| Application | Auto /medical/agricultural/train/valve/textile, Ductwork |
| Process | bending, Stamping, Metal cutting, Precision Metal Stamping, |
| Service | Customized OEM, OEM/ODM, OEM ODM Metal Stamping, |
| Surface treatment | anodizing, chemical treatment, Grinding, Available, |
| Finish | Anodized, Polishing, Blackened |
3 Product Details
Use: Car
Function: structure part of a car door, use it to conect different metal parts.
Technology: metal stamping, punch press, powder coating
4 About Strong
Strong metal was established in June 2003 with a total registered capital of 67 million yuan and a total
construction area of 30,000 square meters. It has 5 factories in total which are located in Nantong,
Taicang, Nanjing, Vietnam, and Shanghai.
Strong has many advanced production equipments: 50+ punch press machines (highest 1000 ton),
20+plastic injection machines (highest 740ton), 20+ bending machines (highest 600 ton), 20+ automatic
welding arms, 50+ welding working tables, 8+ laser cutting machines, and a 400m powder coating line,
etc. In terms of the QC testing tool,
5 FAQ
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock,
it is according to quantity.
Q: Are you a trading company or manufacturer?
A: We are a manufactory.
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What are your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance
before shipment.
If you have another question, pls feel free to contact us.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

