Shanghai Strong Metal Production Co., Ltd.
                                                                                                           
Verified Supplier
23 Years
Since 2003
Menu
Fabrication Services Sheet Metal Fabrication

Wall hanging furnace control box guard plate Stainless Steel Precision Service

Price Negotiable
Price: negotiated
MOQ: negotiated
Delivery Time: 4-8weeks
Brand: Strong
Product Description

Manufacture Custom Stainless Steel Aluminum Sheet Metal Fabrication

 

1 Application of electrostatic spraying in sheet metal processing

Laser in each contact with new equipment, or a new experiment, the first step must be focusing, only to

find their own focal plane, in order to correctly determine the other process parameters such as defocus,

power, speed, etc., do know.

 

2 Technical Parameters

Product name Wall hanging furnace control box guard plate Stainless Steel Precision Service
Key Words Sheet Metal Project Sheet Metal service
Place of Origin China
Brand Strong
Material DX51D+Z,
Color Yellow

 

 

 

3 Product Details

Use: Train seatFunctions: Assembled at the bottom of the seat to turn the seat in different directions
Technology: laser cutting, welding, powder spraying

 

4 About Strong

undefined

The dot method is also divided into a variety of, each manufacturer will have different use habits: suitable for

larger focal depth, spot size change in the direction of the Z axis of the fiber laser, through a row of points,

see the changing trend of the plate surface point, adjust the Z axis change 0.5 mm each time, and mark on the

steel plate from large to small, and then from small to large process, the smallest point is the focus.

factory.jpg

 

5 FAQ

Q: Are you a trading company or manufacturer?
A: We are a manufactory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock,

it is according to quantity.
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What are your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance

before shipment.
If you have another question, pls feel free to contact us.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shanghai Strong Metal Production Co., Ltd.
Location 1501, 1199 Defu Road, Jiading District, Shanghai
Contact Person Jeremy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.