PVC Home Appliance Mold 718 / NAK80 Household Mold Soccer Knee Pad
Price:
Negotiable
MOQ:
1set
Delivery Time:
Negotiable
Brand:
XuLiDa
Product Description
Mold Customization Soccer Baseball Knee Pad Shield Mold Home Appliance Mold
Our advantage
1. Resonable price
2. Good after service
3. Experienced skilled workers and professional engineers
4. Good quality ,excellent service ,long life mould
5. On time delivery time
6. Send project schedule report and pictures to buyer to show the progress of the machineing.
7. Our international sales team work 24 hours per day to serve you
Product info
|
Please provide
|
2D, 3D, samples, or the size of the multi-angle pictures.
|
||
|
Mould material
|
45#, 50#, P20, 738, 738H, 718, 718H, NAK80, 2316, 2316A, S136 etc.
|
||
|
Product material
|
ABS,PA6,PA66,PP,PC,TPU,POM,PBT,PVC,TPE,TPV,TPO,TPR,EVA,LDPE etc.
|
||
|
Cavity
|
Single-cavity, Multi-cavity or by requested.
|
||
|
Runner system
|
Cold runner or Hot runner.
|
||
|
Mould precision
|
±0.01mm.
|
||
|
Mould Life
|
50-100 million shots.
|
||
|
Software
|
CAD, PRO-E, UG, Rhinoceros etc.
|
||
|
Design Time
|
1-3 days (normal circumstances).
|
||
|
Main thechnology
|
Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes etc.
|
Faq
Q1: What kind of molds do you make? Plastic injection mold, Die casting mold or something else?
A1: Mainly plastic mold injection and Die casting mold.
Could allso make stamping molds according to our customer’s requirements.
A1: Mainly plastic mold injection and Die casting mold.
Could allso make stamping molds according to our customer’s requirements.
Q2: What types of files do you accept (drawings)?
A2: STP, IGS, DXF, DWG, Cad Key PPT, STL, X_T, CATIA, UG files, etc.
A2: STP, IGS, DXF, DWG, Cad Key PPT, STL, X_T, CATIA, UG files, etc.
Q3: What kind of steel do you use for plastic mouldings?
A3: P20, 718, 8407, NAK80, H13, S136, DIN 1.2738, DIN 1.2344, etc.
Q4: How long is the lead-time for a plastic injection mold?
A4: It depends on the mold’s size and complexity. Normally 25~45 days.
A3: P20, 718, 8407, NAK80, H13, S136, DIN 1.2738, DIN 1.2344, etc.
Q4: How long is the lead-time for a plastic injection mold?
A4: It depends on the mold’s size and complexity. Normally 25~45 days.
Q5: Do you make spare parts for your customer?
A5: Yes, we will provide spare parts if needed.
A5: Yes, we will provide spare parts if needed.
Q6: How do you pack the china plastic moulds?
A6: Wooden box.
First : Daub rust preventive oil on the mold.
Second : We pack the mold with thin plastic film to avoid moisture.
Third : We put this plastic film packed mold in a wooden box, and fix it avoid any movement.
A6: Wooden box.
First : Daub rust preventive oil on the mold.
Second : We pack the mold with thin plastic film to avoid moisture.
Third : We put this plastic film packed mold in a wooden box, and fix it avoid any movement.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
XIAMEN APRA PRECISION MACHINERY CO.,
Location
No. 107, 1st floor, No. 2897, Chiping Road, Tong'an Industrial Concentration Zone, Xiamen
Contact Person
Ye


