Jiangsu Zhongxinhe New Material Technology Co., Ltd.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

32mm Thickness Aluminium Foil Underlay Anti Crush Vapor Proofing Noise Reduction

Price Negotiable
Price: Negotiable
MOQ: 1000 sqm
Delivery Time: 12WORKING DAYS
Brand: No brand
Product Description

3mm Black EVA Foam aluminum foil Underlay For Laminate Floor noise reduction

 

Introduction:
EVA (Ethylene-Vinyl Acetate) Underlayment is designed for using under floated laminate, bamboo and engineered wood floors and is ideal for many types of subflooring. This underlayment is with a 32 mm thickness foam layer that provides optimal cushioning and sound absorption, as well as a closed cell foam design that offers excellent moisture vapor resistance. It also coordinates the comfort with your floorings.

 

Feature:
Designed for noise reduction and cushioning under flooring
Crush resistant, durable and high acoustic performance under floor
Built-in moisture barruer where moisture protection is required
Easy to install
Helps to eliminate minor sub-floor imperfections
Excellent foot traffic sound insulation
Anti-crush technology for excellent preformance and long life
Mold and mildew resistance
Advanced waterproof and excellent moisture protection
Maximum sound reduction
Self sealing lip and tape system for easy installation
Suitable for use over concrete and wood subfloors

 

 

Description EVA foam with aluminum foil
Color black
Density 110kg/cbm
Roll size 200 sq.ft
Thickness 3mm
Coaing aluminum foil

 

 

How to Install

Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free of any foreign objects.

Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to keep it as even as possible across the room.

Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section using your scissors or utility knife.

Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping film on the previous section.

Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is flush up against the other piece of underlayment and on top of the overlapping film.

Step 6: Cut Section
Cut the next section of underlayment.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Zhongxinhe New Material Technology Co., Ltd.
Location NO.28 XINCHUN ROAD JINDONG INDUSTRIAL PARK CHANGZHOU CITY, JIANGSU PROVINCE, CHINA
Contact Person James

Request A Quote

Please check your email address.
Your message must be at least 20 characters.