Shaanxi Zhongtuo Mine Equipment Co.,Ltd
                                                                                                           
Verified Supplier
21 Years
Since 2005
Menu
Construction & Real Estate Metal Building Materials

Cold Extruded Rebar Steel Sleeve For Industrial / Civil Buildings

Price Negotiable
Price: Negotiable
MOQ: 50
Delivery Time: 7-15Days
Brand: ZHONGTUO
Product Description

Description of Rebar Steel Cold Extruded Sleeve
The steel bar cold extrusion connection method is to put steel pipes on the ends of the two steel bars to be connected, and then squeeze them with a portable cold extrusion machine to deform the cold extrusion sleeve and connect the two steel bars into one. tool. This method is applicable to industrial and civil buildings, high-rise buildings, foundation engineering, etc.
 
Advantages of Rebar Steel Cold Extruded Sleeve
1. Its own stability is not affected by many factors such as the chemical composition of steel bars, human factors, climate, and electricity.
2. It is green, environmentally friendly, pollution-free, meets environmental protection requirements, and is safe and reliable for operation without open flames.
3. Wide range of applications, suitable for various orientations and the connection of steel bars with the same and different diameters.
4. Excellent quality, high strength, stable and reliable quality. Easy to use, easy to operate, and fast in construction.
 
Technical Parameters of Split Sleeve Rebar Joint

Model Inner wall thickness Inside Diameter outer diameter*length Weight/pc Total Quantity Total Weight
164 5mm 20mm 30*100mm 0.31kg 100 31.00kg
18 5.5-6mm 22-23mm 34*118mm 0.47kg 70 32.90kg
200 5.5-6mm 22-23mm 36*120mm 0.53kg 60 31.8kg
222 6-6.5mm 27-28mm 40*132mm 0.70kg 45 31.50kg
25 7-7.5mm 30-31mm 45*150mm 1.00kg 30 30.00kg
28 8-8.5mm 33-34mm 50*168mm 1.43kg 20 28.60kg
320 9-9.5mm 38-39mm 57*192mm 2.10kg 15 31.50kg
360 10mm 53mm 63*216mm 3.00kg 12 36.00kg
400 11mm 59mm 70*240mm 4.00kg 8 32.00kg

 
Cold extrusion sleeve connection process:
The steel extrusion connection is divided into two processes.
The first process is to press one end of each steel bar to be connected with half of the casing as required on the ground.
The second process is to press half of the steel bar of the joint and insert it into the end of the steel bar to be connected, and then press it with extrusion pliers, so that the extrusion work of the whole joint is completed.
The extruded joint must be extruded sequentially from the middle of the sleeve to the end as marked.
Rebar half-joint connection process:
Namely the above-mentioned first process, and its specific steps are as follows:
⑴Install the high-pressure oil pipe and steel bars with stoppers and casing dies, and apply lubricating oil to the dies;
⑵Press the manual upper switch to align the sleeve with the inner hole of the die, and then press the manual OFF switch;
⑶Insert the steel bar and push it to the limiter for straightening;
⑷ Press the manual upper switch to squeeze;
⑸When you hear the sound of hydraulic oil overflowing, press the manual switch again, return the plunger, and remove the die;
⑹Take out the half casing joint, and end the half joint extrusion operation.

The continuous bar extrusion process:
Namely the above-mentioned second procedure, and its specific steps are as follows:
⑴Insert the half casing into the steel bar to be connected to the structure, so that the extruder is in place;
⑵Placing dies and pads used with steel bars;
(3) Press the manual upper switch to squeeze, when you hear the sound of hydraulic oil overflowing, press the manual lower switch;
⑷Return the plunger and guide plate, and install the spacer;
⑸Press the manual upper switch to squeeze;
⑹Press the manual upper switch, return the plunger and add a pad;
⑺ Press the manual upper switch to squeeze, and then press the manual lower switch to return the plunger;
⑻Remove the pad, die, and extruder, and the steel bars are connected.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shaanxi Zhongtuo Mine Equipment Co.,Ltd
Location Room 1806, Block B, Haiyi International Building, Fengcheng 5th Road, Weiyang District, Xi'an City, Shaanxi Province
Contact Person Summer

Request A Quote

Please check your email address.
Your message must be at least 20 characters.