Guangdong MEI-AL Technology Co., Ltd.
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu
Machinery Environmental Machinery Water Treatment Machinery

Industrial Nickel Anodizing Wastewater Treatment Line - 230 m³/day Capacity with ≤1 mg/L Nickel Removal

Price Negotiable
Price: RMB500000-3000000/set
MOQ: 1set
Delivery Time: 30-90days
Brand: MEI-AL
Product Description
Industrial Nickel Anodizing Wastewater Treatment System
Complete wastewater treatment production line designed for anodizing facilities with 300-ton monthly output capacity. This system effectively treats acidic, alkaline, and nickel-containing wastewater to meet strict environmental discharge standards.
System Design Specifications
  • Total wastewater treatment capacity: ≤230 m³/day
  • Acid-base wastewater volume: ≤200 m³/day
  • Nickel-containing wastewater volume: ≤30 m³/day
  • Continuous treatment operation for consistent performance
Discharge Quality Standards
Contaminant Unit Maximum Concentration
Temperature ≤40
pH Level - 5.5-9.5
Mineral Oil mg/L ≤20
Suspended Solids (SS) mg/L ≤25
Nickel (Ni) mg/L ≤1
Nickel Wastewater Treatment Process
  • Collection and homogenization in sump tank
  • Chemical treatment with reducing agents in duplex reactor
  • pH adjustment to alkaline conditions
  • Flocculation with PAM for precipitation
  • Sedimentation and sludge separation
  • Sludge dewatering via filter press
  • Final discharge to alkaline wastewater tank
Process Flow Diagram
Nickel anodizing wastewater treatment process flow diagram showing collection, chemical treatment, sedimentation, and sludge handling stages
Sludge Management
Comprehensive sludge handling system includes concentration, dewatering via filter press, and proper disposal through certified waste management partners to prevent secondary environmental contamination.
Note: This system specifically handles cleaning wastewater from water washing tanks and excludes tank discharge liquids. The process does not include acid etching or three acid polishing operations.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangdong MEI-AL Technology Co., Ltd.
Location No. 1, Changgang North Road, Changhongling Industrial Park, Shishan Town, Nanhai City, Foshan City
Contact Person rainbow

Request A Quote

Please check your email address.
Your message must be at least 20 characters.