Guangdong MEI-AL Technology Co., Ltd.
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

200T/M AUTO High-end Customized Aluminiun Suface Treatment Anodizing Production Line Equipment

Price Negotiable
Price: RMB3,000,000-4,000,000/set
MOQ: 1set
Delivery Time: 180-200days
Brand: MEI-AL
Product Description

 

200T / Month Auto High-end Customized Anodizing production line  Aluminiun Suface Treatment

一. Production Description:

1.Anodizing production lines are designed with environmental considerations in mind.

2.As production needs grow, mini anodizing production lines can often be expanded with additional automation modules.

3.A mini anodizing production line can be integrated into a larger manufacturing process or assembly line.

二.Process Tank

1 Degreasing 【Free sulfuric acid 180±30 g/l】 1 Tank
2 Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】 1 Tank
3 NeutralizationFree sulfuric acid180±20g/l】 1 Tank
4 Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】 1Tank
5 Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】 1 Tank
6 Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】 1 Tank

 

.Design Condition

1 Alloy Aluminium 6061 to 6063 or others
2 Anodizing film thinkness 10~ 12µm micron
3 Average coverage area 350m²/T (ton)
4 Max aluminium profile length 6500mm
5 Extrusion ratio 2.5kg/m²
6 Working hour/m 300d/m x 20h/d = 600h/m
7 Racking system Two fixtures /rack
8 Racking operation Manual
9

Equipment Usage Rate

 

0.9
10 Power supply AC 3phase 380v 50hz
11 Control Power AC220V 50Hz
12 Water supply 2kg/cm²·G
13 Hot steam 6kg/cm²·G
14 Compressor air 6kg/cm²·G

四.Treatment Process:

  1. Degreasing
    (1) 6jig(rack)/ tank x 1 tank
    =6jig(rack)
    (2) treatment time: 2-5min
  2. Alkaline Etching
    (1) 6jig(rack) / tank x 2 tank
    =12jig(rack)
    (2) treatment time: 3-15min
  3. Neutralization
    (1) 6jig(rack) / tank x 1 tank
    =6jig(rack)
    (2) treatment time: 1-5min
  4. Anodizing
    (1) 2 jig(rack)/tank x 1tanks = 2jig(rack)
    (2) Current density: 130A/m²
    (3) Process time: 30min
    (4) Unprocess time: 10min
    (5) Total time 30+10=40min

(6) Average anodizing layer : 0.36*1.3*30*0.77 =10.81um

  1. Colour 1

1) Clour process: Mix Salts

2) Quantity:2 jig(rack)/tank x 1tanks = 2jig(rack)

3) Current density: 70A

4) Process time: 2-8min

 

6. Sealing
1) Sealing menthod: Sealing at Medium or Normal Temperature
2)
Quantity:6jig(rack)/tank x 1 tank
3) Process time 10-15min

 

五.Design Parameter and Setting

1. Anodizing treatment area:
1) Each anodizing process tank need 40min ,where total jig(rack)/year:

( 2 rack x 1 tank x 60min/h) ÷40min x600 hour =1800jig(rack)

2) Design 50m²/jig(rack) . Where every tank is 100m²
3)
Area treatment/year : 1800jig(rack)x 50m² /jig =90000m²

 

2. Anodizing treatment weight:
Monthly output : 90000m²÷350m²/T*0.9=231T≧200T

 

3. Power consumption:
1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank

Power Rectifier : 15000A =1unit
2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank

Colour Rectifier : 8000A =1 unit

 

六.Process Chat

 

Discription for Un
1 De Degreasing
2 Rs Rinsing
3 HW Rs Hot Water Rinsing
4 AE Alkaline Etching
5 Ne Neutralization
6 An Anodizing
7 Cl Coloring
8 Sl Sealing
9 MU Material Unloading
10 Pc Packing

 

 

 

 

Type: anodizing and colouring surface treatment equipment Advantage: saving space and energy,lowest cost ,best service
Condition: new brand Applicable Industries: Construction projects, manufacturing facilities, retail establishments, and shops that repair machinery
Warranty: 365 days Heating power: natural gas, LNG
Voltage: 380V 50Hz or Customers Local Voltage After-sales service provided: Engineers on hand to repair gear abroad

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangdong MEI-AL Technology Co., Ltd.
Location No. 1, Changgang North Road, Changhongling Industrial Park, Shishan Town, Nanhai City, Foshan City
Contact Person rainbow

Request A Quote

Please check your email address.
Your message must be at least 20 characters.