316L Stainless Steel Powder Metallurgy Computer Hinge Parts | 0.01-50g Weight Range | 15-25 Day Mold Lead Time
Price:
Negotiable
MOQ:
1
Delivery Time:
10~15 days
Brand:
Hardened Stainless Steel Powder
Product Description
Product Overview
Custom 316L stainless steel powder metallurgy parts manufactured through metal injection molding (MIM) technology, specifically designed for computer hinge applications requiring high precision and durability.
Manufacturing Capabilities
Our 10,000 m² production facility in Guangdong, China specializes in high-precision powder metallurgy components with comprehensive OEM services.
- Iron base, copper base, and stainless steel materials
- High precision, strength, density, and hardness components
- Serving electric tools, automotive, medical, and electronics industries
Technical Specifications
- Average component weight: 0.01-50 grams (3mm-200mm size range)
- Maximum component capacity: Up to 120 grams
- Material: 316L Stainless Steel for corrosion resistance
- Mold lead time: 15-25 days depending on complexity
Available Materials
| Material | Process | Properties | Applications |
|---|---|---|---|
| Cu 99.9 | Pressure Molding | Excellent electrical/thermal conductivity and corrosion resistance | Electrical connectors, cooling elements |
| Stellite | Metal Injection Molding | Cobalt-chromium hard alloy with superior wear resistance | Turbine blades, valve seats, turbocharger components |
| WC / Co 88 / 12 | Powder Forming | High hardness and temperature resistance | Cutting tools, forming technology |
| NdFeb | Powder Metal Forming | Strong permanent magnetic properties | Loudspeakers, motors, magnetic clamps |
| Tungsten | Pressure Molding | High melting point, density, and strength | Aerospace components, medical shielding, electrical contacts |
Product Images
Frequently Asked Questions
What products can you supply?
Metal injection molding products, powder metallurgy components, metal sintered parts, high pressure molding parts, and powder forming accessories.
How long is the lead-time for mold?
Typically 15-25 days depending on product size and complexity.
I have no 3D drawing, how should I start the new project?
Provide us with a sample, and we'll create the 3D drawing design for you.
Before shipment, how to make sure the products quality?
We provide comprehensive video documentation including production process details, dimensional verification, surface inspection, and packaging confirmation.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Guangzhou Herong Intelligent Device Technology Co., Limited
Location
19/F, Building 9, No. 1, Jingdong Road, Fenggang Town, Dongguan City, Guangdong Province
Contact Person
Zeki