Metal Injection Molding Components 0.01-120g with Powder Metallurgy for Industrial Applications 3-200mm Size Range
Price:
Negotiable
MOQ:
1
Delivery Time:
10~15 days
Brand:
mim
Product Description
Manufacturing Capabilities Overview
We specialize in precision manufacturing of powder metallurgy components and injection molded parts for industrial applications. Our expertise spans multiple manufacturing processes to meet diverse industry requirements.
Core Manufacturing Processes
- Plastic Injection Molding
- Metal Injection Molding (MIM)
- Die Casting
- Surface Treatment
- Assembly Technology
Technical Specifications
Size and Tolerance Capabilities
Our Metal Injection Molding (MIM) process excels with small to medium-sized components. We specialize in parts weighing 0.01-50 grams with dimensions ranging from 3mm to 200mm. Larger components up to 120 grams are also achievable with our advanced manufacturing capabilities.
Available Materials
| Material | Process | Properties | Applications |
|---|---|---|---|
| Cu 99.9 | Pressure Molding | Excellent electrical/thermal conductivity and corrosion resistance | Electrical connectors, cooling elements |
| Stellite | Pressure Molding / MIM | Cobalt-chromium hard alloy with superior wear resistance | Turbine blades, valve seats, turbocharger components |
| WC / Co 88 / 12 | Metal Powder Forming | High hardness and temperature-resistant carbide | Cutting tools, forming technology applications |
| NdFeb | Powder Metal Forming | Strong permanent magnetic properties | Loudspeakers, motors, magnetic clamps |
| Tungsten | Pressure Molding | High melting point, strength, and density properties | Aerospace components, medical shielding, electrical contacts |
Product Showcase
Frequently Asked Questions
What products can you supply?
We provide comprehensive manufacturing services including metal injection molding products, powder metallurgy components, metal sintered parts, high pressure molding parts, and powder forming accessories.
How long is the lead-time for mold development?
Mold development typically requires 15-25 days, depending on product size and complexity.
How can I start a new project without 3D drawings?
Simply provide us with a molding sample, and our engineering team will create the complete 3D drawing design.
How do you ensure product quality before shipment?
We conduct comprehensive quality inspections and provide detailed video documentation covering production processes, dimensional verification, structural analysis, surface quality assessment, and packaging details.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Guangzhou Herong Intelligent Device Technology Co., Limited
Location
19/F, Building 9, No. 1, Jingdong Road, Fenggang Town, Dongguan City, Guangdong Province
Contact Person
Zeki