TOBO INDUSTRIAL (SHANGHAI) CO., LTD
                                                                                                           
Verified Supplier
Years
Since
Menu

Customized Size CuNi 9010 C70600 Pipe Fittings Copper-Nickel Alloy Steel Pure Copper Bar

Price Negotiable
Price: NEGOTIATION
MOQ: 50
Delivery Time: 15WORKSDAY
Brand: TOBO
Product Description

Product descriptions from the supplier

 
 
 

Video Description

 
 
Detailed Information
Production Range:
Round Steel Pipe (16mm-419mm)
Square Steel Pipe (20mm*20mm-500mm*500mm)
Rectangular Steel Pipe (20mm*30mm-400mm*600mm)
 
Specification
OD
16mm-419mm
WT
2.0-9.0mm
Length
1-12m
Standards
EEMUA 144 SEC.1
Pipe ends
plain, beveled, threaded, socket with holes
Treatment
or as customers' requirement
Delivery Time
10days from stock; 15-25workdays produced according to the qty
Price Term
CIF, CFR, EXW
Loading Port
Shanghai, China
Others
1.All the pipes is high-frequency welded.
2.Both inner and outer welded stab can be removed.
3.Special design available according to requirement.
4.Pipe can be necked down and punched holes.
5.Supplying BV or Inspection if client need.
Product Testing
Our Company
We are one of the Professional manufacturers Exporter Pipeline products in China .
Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000 square meters, existing 260 workers and 45 technicians. We have five branch factories which can supply the best quality pipes, tubes, fittings, flanges and related accessories. Now, it owns a number of advanced pipe production equipments, metal, forging, machining, cold forming, hot extrusion, such as heat treatment process, producing 60, 000 tons of pipe fittings. Company with a variety of detection devices, such as nondestructive testing, chemical analysis, metallographic examination, physical experiments. The technical is very strength, our main products contain fittingsforged socket welding fittings and threaded fittings, pipe weld and the materials of the products contain stainless steel ,duplex-stainless steel alloy steel.
Certifications
Recommend Products
 
FAQ
Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L , West Union,VISA is also accepted.

Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.

Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.
If you have any question,please feel free to contact me. Sales Service 24 hours
we are sure your inquiry or requirements will get prompt attention.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TOBO INDUSTRIAL (SHANGHAI) CO., LTD
Location Room 3025, Floor 3, Area C, CAS Square, No.488, Anchi Road, Anting Town, Jiading District
Contact Person Vicky

Request A Quote

Please check your email address.
Your message must be at least 20 characters.