Copper Nickel Elbow CuNi 90/10 C70600 Price Butt Weld 90 Degree LR Elbow ASME B16.9 Class 150
Price:
Negotiable
MOQ:
one piece
Delivery Time:
15~30 Workdays
Brand:
TOBO
Product Description
Copper Nickel Elbow CuNi 90/10 C70600 Price Butt Weld 90 Degree LR Elbow ASME B16.9 Class 150
1. Product Description
Our copper nickel elbows are precision-manufactured pipe fittings designed to change the direction of fluid flow in piping systems. They are primarily made from CuNi 90/10 (UNS C70600) and CuNi 70/30 (UNS C71500) alloys, which exhibit exceptional corrosion resistance in seawater and chloride-rich environments. Available in seamless and welded configurations, our elbows are manufactured in strict accordance with international standards including ASME B16.9, ASTM B466, and ASTM B122. We offer a complete range of angles, radii, and connection types to meet the diverse requirements of marine, offshore, and industrial applications.
2. Key Product Parameters
| Parameter | English Specification | |
|---|---|---|
| Material Grades | CuNi 90/10 (UNS C70600), CuNi 70/30 (UNS C71500) | |
| Standards | ASME B16.9, ASTM B466, ASTM B122, MSS SP-75 | |
| Size Range | 1/2" - 24" (DN 15 - DN 600) | |
| Wall Thickness | Schedule 10S, 40S, 80S, 160S, XS, XXS | |
| Angles | 22.5°, 45°, 90°, 180° | |
| Radius Types | Long Radius (LR=1.5D), Short Radius (SR=1.0D) | |
| Connection Types | Butt Weld, Socket Weld, Threaded | |
| Pressure Classes | Class 150, Class 300, Class 600, Class 900 | |
| Manufacturing Process | Hot Forming, Cold Forming, Induction Bending |
3. Product Applications
-
Marine industry: Seawater cooling systems, ballast water management systems, fire suppression pipelines, and bilge systems on ships and vessels
-
Offshore oil and gas: Production platforms, subsea pipelines, and FPSO (Floating Production Storage and Offloading) units
-
Desalination plants: Seawater intake systems, reverse osmosis pipelines, and brine discharge lines
-
Coastal power stations: Condenser cooling systems and circulating water pipelines
-
Chemical processing: Corrosive fluid handling systems
-
Naval applications: Warships, submarines, and minesweeper vessels

FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
TOBO INDUSTRIAL (SHANGHAI) CO., LTD
Location
Room 3025, Floor 3, Area C, CAS Square, No.488, Anchi Road, Anting Town, Jiading District
Contact Person
Vicky