CHANGZHOU LIANGRU INTERNATIONAL TRADE CO., LTD.
                                                                                                           
Verified Supplier
18 Years
Since 2008
Menu

Plastic Paper Double Shaft Shredder Machine Blades Waste Recycling

Price Negotiable
Price: Negotiation
MOQ: 1 Set
Delivery Time: 15-20days
Brand: Liangru
Product Description

Waste Recycling Plastic Paper Double Shaft Shredder Machine Blades

 

Production Process

  • Blanking---choose materials according to customer requirements.
  • Forging--Forging is mainly to increase the density of the material.
  • Annealing-to lower the temperature for processing.
  • Finishing-mainly processing the material into shape.
  • Inspection---inspect whether the product is consistent with the drawing sample.
  • Quenching-improve the corresponding hardness of the molded product and material.
  • Annealing--In order to increase the wear resistance of the product, it must be annealed for a long time.
  • Quenching and tempering-mainly the parallelism of quenched and tempered products to facilitate processing.
  • Coarse grinding-rough grinding of each surface of the product.
  • Precision grinding-super precision grinding, mirror grinding, improve the accuracy and parallelism of the product.
  • Inspection-Let unqualified products refuse to flow into the market.
  • Packing--different packing according to different products.

 

Main feature:

  • Easy and fast cutting, sharp edge.
  • Long lifespan and stable performance
  • Good cutting result and high efficiency

Specifications:

Size
34*34,40*40, 42*42, 45*45 mm and many more size
Material
D2 1.2379, high alloy tool steel
Hardness
58-60 HRC
Tolerance
Exceed OEM specification
OEM Service
Available
Packing
Wooden boxes, standard export packaging
Application
Shredder blades for Plastic, Rubber, Metal, Waste Recycling
Delivery time
30 days after deposit be received

 

FAQ:

 

1. Q: How do we know that you are a manufacturer under this special period?
A: We can make a video call any time to show you our actual factory.
 
2. Q: Can I get a special design for my products?
A: We have our R&D department offering customization services for our customers.
 

3. Q: Are you a factory or a trading company?

A: We are a professional factory who gets 20+ years of professional experience

 

4. Q: How long is your delivery time?
A: 1 set for normal standard machine needs about 3-7 working days. For 1 or more containers, needs about 20-30 working days.
 

5. Q: How long is your warranty?

A: Within 1 year from the date of the factory, if parts are a failure or are damaged the cause of a quality problem (except wearing parts), we provide these parts for free.

 

6. Q: What is your payment term?
A: T/T 100% before shipment, L/C at sight, western union or Trade Assurance order recommended.
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHANGZHOU LIANGRU INTERNATIONAL TRADE CO., LTD.
Location RM.1609-1611. NO.8 BLDG, HUADONG MACHINERY AND ELECTRICAL TRADE CENTER NO.29 XIACHENG MIDDLE ROAD, HUTANG, CHANGZHOU, JIANGSU 213161, CHINA
Contact Person Lau

Request A Quote

Please check your email address.
Your message must be at least 20 characters.