Jiansu Hengsai Metal Co.,Ltd
                                                                                                           
Verified Supplier
Years
Since
Menu

Custom Diameter Q235 Carbon Seamless Steel Pipe Q195 Q345 Low Carbon Tubing

Price Negotiable
Price: Contact Us
MOQ: 1 Ton
Delivery Time: 5-20 work days
Brand: Carbon Steel
Product Description

Q195 Q235 Q345 Hot Rolled Cold Rolled Carbon Steel Pipes Clean Blasting Painting

Low Price Custom Diameter Bending Q235 Low Steel Pipe Seamless Carbon Steel Pipe/Tube

Carbon steel pipe is made by hot rolling and cold drawing. The hot-rolled seamless steel pipe is frequently used to construct the piping systems of large diameter and long distance pipelines. It can also be used in the manufacture of structural parts and mechanical parts, such as oil drill pipes, automobile transmission shafts, bicycles Frames and steel construction scaffolding. The cold-drawn seamless pipe is used for precision machinery manufacturing, pipeline transportation, instrumentation and hydraulic & pneumatic cylinders industry.

The process of carbon steel pipe manufacturer involves cutting the raw material into small pieces and then heating it to a high temperature so that it can be easily worked with. After that, the steel is passed through rollers to get the desired shape. Next, the edges of the steel are welded together to create a seam. Finally, the welded pipe is passed through a quality inspection before being shipped off to the customer.

 

 

Product Name
Carbon steel pipe
Material
Q195 = S195 / A53 Grade A
Q235 = S235 / A53 Grade B / A500 Grade A / STK400 / SS400 / ST42.2
Q345 = S355JR / A500 Grade B Grade C
 
10#,20#,45#,Q235,Q345,Q195,Q215,Q345C,Q345A
 
16Mn,Q345B,T1,T2,T5,T9,T11,T12,T22,T91,T92,P1,P2,P5,P9,P11,P12,P22,P91,P92,
 
15CrMO,Cr5Mo,10CrMo910,12CrMo,13CrMo44,30CrMo,A333 GR.1,GR.3,GR.6,GR.7,etc
 
SAE 1050-1065
Color
Clean, blasting and painting or as required
Technique
Hot rolled/Cold rolled
Used
Shock absorber,Motorcycle accessories,drill pipe,Excavator accessories,Auto part,hight pressure boiler tube, honed tube,Transmission shaftetc
MOQ
5tons.We also can accept sample order
Capacity
200,000 tons/year
Shipment time
Within 15-20 days after receiving advance payment

 

 

 

Inspection
 
 
Packaging Details:
1. Small OD: In hexagonal bundle with steel strips
2. Large OD: In bulk
3. Wrapped in waterproof plastic woven bag
4. Filled in wooden cases
5. As required

Delivery Detail:Shipped in 15-20 days after advance payment
 
 
 
Factory
 
 
FAQ
Q1: Do you provide samples? Is it free or extra?
A1: Yes, we can provide samples free of charge and the customer will pay the freight.

Q2: What if I don't have export experience ?
A2: We have reliable forwarder agent which can ship items to you by sea/air/Express to your doorstep. Any way, we will help you choose the most suitable shipping service.

Q3: How long is your lead time?
A3: If it is in stock, it is usually 5-10 days. Or, if there is no inventory, 15 days, depending on the quantity.

Q4: What are your terms of payment?
A4:30% T/T deposit in advance, 70% T/T balance within 5 days after B/L copy, 100%.Irrevocable L/C at sight, 100% Irrevocable L/C after receive B/L 30-120 days, O/A.

Q5: How is your technical support?
A5: We provide lifetime online support through Whatsapp/ Skype/ Wechat/ Email. Any problem after delivery, we will offer you call anytime.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiansu Hengsai Metal Co.,Ltd
Location Liangxi District, No.100, Fengbin Road, Liandong U Valley
Contact Person Leo

Request A Quote

Please check your email address.
Your message must be at least 20 characters.