Glass Bottle Carbonated Drink Washing Filling Capping Machine With Aluminum Cap
Glass Bottle Carbonated Drink Washing Filling Capping Machine With Aluminum Cap
It's used to filling gas-contained liquid in glass bottle - special plastic ring pull aluminum cap, with bottle washing, filling, sealing parts.Widely used in every beverage factory.
Product Paramenters:
Automatic Glass Bottle Carbonated Drink Filling Machine for Cola,Soda Water etc
| Main Technical parameters | |
| Model | NPXGF18-18-6 |
| Produciton capacity(330ml) | 3000-5000 |
| Heads of Rinsing Filling & Capping | 18-18-6 |
| Suitable bottle height (mm) | 160-340 |
| Suitable bottle diameter (mm) | 50 ~ 100 |
| Rinsing Water pressure (MPa) | 0.25 ~ 0.3 |
| Filling way | Isobaric filling (twice vacuumized ) |
| Filling temperature (℃) | 0~5 |
| Filling pressure(MPa) | 0.15~ 0.5 |
| Main motor power(kw) | 3 |
| Total power(kw) | 3.18 |
| Overall dimensions(mm) | 3012x2012x3260 |
| Weight(kg) | 3800 |
Details of the Machine
- Glass bottle Separating..
- Energy saving. High efficient. Adapt to customer factory layout
- Special lubrication system, keep products clean, health, safety
- Extended service life
- Electric eyes design keep whole line running safety and quickly
- Overload protection mechanism to effectively ensure the safety of the machine
- Glass Bottle Washing.
Spring cramps are used in the bottle washing process.
The empty bottles can be turned over 180~ along the conveying rail.
There are two times of internal and external washing, the efficiency of bottle washing is high.
- Glass Bottle Filling
The filling machine is designed with advanced technology.
The high quality of filling valve is adopted for filling the liquid, with fast filling speed,
High filling precision, stable filling function, long life span to guarantee the quality.
The amount of liquid is accurately controlled and the dropping and leakage are avoided.
-Capping Part
The capping system applies advanced French technology,when clamp the cap will screw immediately and magnetic torque type capping head
Our Service
- Standardized workshop of total 20,000 square meters.
- Verification Certificates of equipments: ISO9001:2001; CE Certificate, Logo trademark registration, etc.
- The equipments will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
- Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
- The engineers are experienced. We can produce different products with different capacity and work out reasonable flow chart as per customers’ requirements to save space.
- Professional installation team who can speak fluent English can help customers make benefits in a shortest time.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.



