Automatic Beer Filling Machine Filling And Capping Machine For Glass / Plastic Bottle

Price Negotiable
Price: Negotiable
MOQ: 1 Set
Delivery Time: 20-45 Working Days After Receiving Your Deposit Payment
Brand: NAVAN MACHINE
Product Description

Automatic Beer Filling Machine , Filling And Capping Machine For Glass / Plastic Bottle

 

Products Description

The series equipment is used in producing all kinds of soda drink contained with polyester with bottle.Washing, filling,sealing can carried out on the same machine.The design of the machine is scientific and reasonable.

 

A fully connected line helps you optimise performance and make smarter decisions across the lifetime of your line. Our holistic approach supports your need for increased flexibility and efficiency, with minimal waste, quick SKU changeovers and lower environmental costs. Reductions in resource consumption and bottle weight, consistent bottle durability and high efficiency are all achieved through careful packaging design, detailed equipment planning and a flexible line setup.

 

 

Equipment Type Automatic

 
Bottle Type

Round or square glass bottle

Volume 200 - 1500ml

Bottle diameter 50-100mm

Bottle height 160-340mm

Output <bph> up to 18000 bph
Your product Beer / wine / vodka / fruit wine and so on
Certificates CE / SGS / ISO 9001


1. Glass bottle carbonated drink filler Triblock Bottle in-feed system

Inlet screw with star-wheel cooperate input the bottle, the suitable bottle is 250ml-1500ml.

 
Glass Bottle Washing.

The new bottle is transported through the separation screw and starwheel by the clamp and turn over device; bottle neck is held up words, after aseptic water rinsing, the bottle neck goes up and transported to another process.


 
 Glass Bottle Filling

A. Filling valve adopts double vacuum to avoid oxygen left in bottles and prolong beer shelf life, with isobaric mechanical valve, High speed and big flow, the high accuracy filling valve, filling speed fast, the liquid level is stable.
B. Main drive adopt gear drive independent, high efficiency, small noise, long life, maintenance-free, transducer can control the main motor speed, the machine adopt Variable-frequency variable speed, whole operations area, motor base is stainless steel contain carbon steel.
C. Guide bottle system, simple structure, according to bottle style ,can change
D. The whole machine can be controlled automatically by PLC.
E. Filling product liquid level height adopts liquid level probe control, liquid level steady, filling reliable.
F. The machine important parts and electrical elements is import production.
G. Filling product can be controlled automatically and have CIP washing connector.


 
Capping Part

The bottle into the click wheel through the transition card bottleneck Capping Machine. Rotary Capping Machine knife stuck on the only bottleneck location, keeping the bottle upright and prevent rotation. Capping Machine Capping head to remain in the revolution and rotation, under the action of the cam to achieve grasping cap, capping, press cap, cap off action, complete the capping process. Management Capping Machine is located in the top cover, through drop-cap rail and cover plate connected Capping Machine allocated. Finished bottle through the bottle capping machine sent from the click wheel to the bottle conveyor chains, conveyor chains send out the triple play by the filling machine, into the next process.

 

FAQ:

Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city. We are factory. Manufacturing mainly beverage filling and packagingmachines.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 15-20 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed.Or you can arrange engineers to study in our factory.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhangjiagang Navan Industrial Co., Ltd.
Location Yangshe Town, Zhangjiagang City, Jiangsu, China
Contact Person Alan Hsiung

Request A Quote

Please check your email address.
Your message must be at least 20 characters.