520kW 650KVA SDEC Silent Diesel Generator Set for Mining/Data Center/Construction Auto-Start, Custom Build, Factory Price
Price:
Negotiable
MOQ:
Negotiable
Delivery Time:
30 working days
Brand:
SDEC
Product Description
520kW 650KVA SDEC Silent Diesel Generator Set
Our 520kW 650KVA BOBIG SDEC diesel generator (Model: 6KTAA25-G39) provides reliable power for mining, data centers, construction, and other demanding applications. Featuring auto-start capability and custom build options at factory pricing.
Power Performance Specifications
| Specification | Prime Power | Standby Power |
|---|---|---|
| Rated Power (kVA) | 650 | 715 |
| Power Rating (kW) | 520 | 572 |
| Frequency (Hz) | 50 | |
| Engine Model | 6KTAA25-G39 | |
| Engine Speed (RPM) | 1500 | |
| Phase | 3 | |
| PF | 0.8 | |
| Control System | Digital | |
| Rated Voltage (V) | 400/230 | |
| Fuel Tank Capacity Operating Time | ≥ 8h @ 75% load | |
Engine Specifications
| Engine Model & Manufacturer | 6KTAA25-G39 (SDEC) |
| Engine Type | In-line, 4 strokes, water-cooled; 4 valves, Turbo charged with aftercooler |
| Combustion Type | Direct injection |
| Cylinder Type | Wet cylinder liner |
| Number of Cylinders | 6 |
| Bore × Stroke | 170 × 185 mm |
| Displacement | 25.2 lit. |
| Compression Ratio | 16 : 1 |
| Firing Order | 1-5-3-6-2-4 |
| Fuel Injection Advance Angle | Electronic control |
| Dry Weight | 2760 kg |
| Dimension | 2348×1181×1659mm |
Alternator Specifications
| Alternator Brand | BOBIG |
| Alternator Manufacturer | FUJIAN BOBIG ELECTRIC MACHINERY CO.,LTD |
| Alternator Model | BW-354F |
| Alternator Rated Power | 520kw/650kva |
| Rated Voltage | 230v/400v |
| Rated Frequency | 50hz |
| Connecting Type | 3 Phase and 4 W |
| Number of Bearing | 1 |
| Protection Grade | IP23 |
| Altitude | ≤1000m |
| Exciter Type | Brushless, Self-exciting, AVR automatic voltage regulating, 100% Copper |
| Insulation Class | H class |
Dimensions and Weight
| Model | BSD715 (Open type) | BSD715S (Silent type) |
|---|---|---|
| Length (L) mm | 3900 | 5400 |
| Width (W) mm | 1610 | 2000 |
| Height (H) mm | 2500 | 2500 |
| Tank Capacity (L) | 1196 | 1196 |
Key Features
- Rated power of 520kW (650KVA) for various industrial applications
- Powered by reliable 6KTAA25-G39 SDEC engine
- Operates at standard 50Hz frequency
- 1500 RPM engine speed for smooth power supply
- Complies with ISO 8528-5:2018, GB/T2820.5-2009, and CE standards
- Operates in ambient temperature range of +5°C to +40°C
- Suitable for altitudes up to 1000m
- Digital control system with standard DSE 6120 controller
Applications
- Industrial Use: Backup power for factories and manufacturing facilities
- Commercial Buildings: Office buildings, shopping malls, and hotels
- Residential Areas: Reliable power for communities with unstable grids
- Specialized Applications: Mining operations, data centers, construction sites
Customization & Services
We support complete customization and OEM services with design drawings. All units feature original power supplies with optional engine, generator, and controller configurations.
Standard equipped with DSE 6120 controller. Engine, generator, and controller options available.
Warranty & Support
BOBIG products include a one-year or 1000-hour warranty (whichever comes first) from ex-factory date. During warranty, we provide free replacement of easy-damageable spare parts caused by production or material quality issues.
Product Image
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
FUJIAN BOBIG ELECTRIC MACHINERY CO.,LTD
Location
NO.8 Jinye Road,Tiehu Village ,Chengyang Town,Fuan City,Ningde City,Fujian Province.CHINA
Contact Person
Andy Bao