4mm 5mm DX51D Galvanized Steel Sheet HDG Z60 Z180 Zinc Coated Gi Sheet
2mm 3mm 4mm 5mm DX51D Galvanized Steel Sheet Plate HDG Z60 Z180 Zinc Coated
Product Description
substrate and the plating layer. Hot-dip galvanizing is to pickle iron and steel parts first. In order to remove iron oxide on the surface of iron and steel parts, after pickling, it is cleaned in an ammonium chloride or zinc chloride aqueous solution or a mixed solution of ammonium chloride and zinc chloride.And then sent to the hot-dip plating bath. Hot-dip galvanizing has the advantages of uniform coating, strong adhesion and long service life.
Product Details:
Product Parameter
| Standard | astm a526 a528 a444, a653, jis g3302, en10142 en1012, etc |
| Grade | DX51D+Z, DX52D+Z, DC52D+Z, DC51D+Z, S350GD+Z, G550, SGCC, DD52D+Z etc |
| Thickness | 0.12-3.0mm (customize, above 3.0mm available) |
| Width | 600-2000mm (customize) |
| Length | as customer requirements |
| Coil inner diameter | 508mm/610mm (customize) |
| Zinc coating | 20-600g/m2 |
| Raw material | cold rolled base. (hot rolled base also available) |
| Technique | hot dipped. (electro also available) |
| Coil weight | 3-8 tons |
| Tolerance | thickness +- 0.02 or +- 0.04, width +-5mm |
| Spangle type | zero spangle, small spangle, regular spangle, big spangle |
| Surface treatment | chromated/non-chromated, oiled/non-oiled, anti-fingerprints |
| Certification | CE, ISO9001-2008, SGS |
| Monthly output | 17000 tons |
| Packaging | 3 layers. kraft paper outside + water-proof plastic film in the middle + steel plate covered with strips outside |
| Landing port | qingdao/shanghai/tianjin port |
| Payment terms | T/T, L/C, western union paypal etc |
| Delivery time | it takes about 10 days for stock goods, or it will need 15-25 days if goods need to be customized |
| MOQ | as customer needs. reminder: more quantity reduce your purchase cost greatly |
Application
1)Package.
2)Coating processing for Cars, Refrigerators, Washing Machines.
3)Industrial Equipment: roller shutter door.
4)Building Material and other fields.
5)Coils could be Coating based sheet for GI,PPGI,PPGL.
Packing and Transportation
FAQ
Q1:What is your terms of payment?
A: 30% T/T in advance, the balance 70% before delivery.
Q2: What is the terms of trade?
A: EXW, FOB, CIF, CFR, DDU.
Q3: What is the terms of packing?
A: Generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers'
requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after received your deposit. For productiong period, it
usually takes about 15-30 days afer receiving the deposit.
Q5: Could you produce according to the samples?
A: Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.


