Carbon Steel Pipe Honed Steel Pipe 4140 4340 Seamless Alloy Tube Cold Drawn Steel Pipee
Carbon Steel Pipe Honed Steel Pipe 4140 4340 Seamless Alloy Tube Cold Drawn Steel Pipee
Product description
Honing pipe: by cold rolling precision seamless steel pipe is made of seamless steel pipe finished or waste, after pickling, phosphating, saponification treatment, and then by cold rolling machine rolling hydraulic steel pipe. The precision of hydraulic steel pipe is very high and can be controlled at 0.02-0. Within the range of 05MM, dedicated to make oil steel barrel diameter.
Product parameter
|
Place of Origin
|
China
|
|
|
Shandong |
|
Brand Name
|
Shuangjiu |
|
Alloy Or Not
|
Non-Alloy
|
|
Section Shape
|
Square
|
|
Special Pipe
|
API Pipe
|
|
Thickness
|
0.6 - 2.5 mm
|
|
Standard
|
JIS, GB, DIN, bs, ASTM
|
|
Certificate
|
API, ce, Bsi, RoHS, SNI, BIS, SASO, PVOC, SONCAP, SABS, sirm, tisi, KS, JIS, GS, ISO9001
|
|
Technique
|
SAW
|
|
Grade
|
1020 1045 4140 4340
|
|
Surface Treatment
|
Smooth and Bright Surface,Oil Dipped
|
|
Tolerance
|
±1%
|
|
Processing Service
|
Welding, Cutting
|
|
Oiled or Non-oiled
|
Non-oiled
|
|
Invoicing
|
by actual weight
|
|
Delivery Time
|
8-14 days
|
|
Terms of Parment
|
T/T, 30% advance payment, balance paid against B/L copy
|
|
Delivery time
|
Within 20 days since advance payment is receied
|
|
Product name
|
Honed Tube for Hydraulic Cylinder
|
|
Surface
|
Black Painted
|
|
Type
|
Seamless Steel Pipe
|
Product advantage
1. It is mainly used to produce pneumatic or hydraulic components
2. For outer cylinder of oil cylinder
3. The honing process is adopted to meet the requirements of the inner hole of the cylinder tube
4. High precision and high finish, the finish can reach ra0.2-0.4um
Product application
Honed tubes are widely used in hydraulic cylinders, cylinders, hydraulic machinery, engineering machinery, petroleum machinery, agricultural machinery, filling machinery, mining machinery and other fields.

FAQ
Q1.What is your terms of payment?
Q2: What is the terms of trade?
A: EXW, FOB, CIF, CFR.
Q3: What is the terms of packing?
A: Generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers'
requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after received your deposit. For productiong period, it usually takes about 15-30 days afer receiving the deposit.
Q5: Could you produce according to the samples?
A: Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
