Hebei E-valves Petroleum Equipment Co., Ltd.
                                                                                                           
Verified Supplier
8 Years
Since 2018
Menu

3 1/16" 10000psi Choke Kill Manifold for Oil & Gas Drilling with 20000psi Maximum Rating

Price Negotiable
Price: USD 50000-100000 per set
MOQ: 1 set
Delivery Time: 7 work days
Brand: Hebei Pantu
Product Description
3 1/16" 10000psi Choke Kill Manifold for Oil & Gas Drilling
The Choke Kill Manifold is an essential pressure control system for oil and gas drilling operations. This robust assembly includes choke valves, gate valves, line pipes, fittings, and pressure gauges to effectively manage well pressure and prevent blowouts during drilling processes.
Primary Function
When the BOP (Blowout Preventer) is closed, the choke manifold controls casing pressure by adjusting choke valve openings, protecting oil layers from contamination while improving drilling efficiency and preventing blowouts.
Technical Specifications
Model Working Pressure (psi) Main Bore Diameter By-pass Diameter Remarks
YG140 20000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 1/16" 2 9/16" Different types of combinations can be provided according to requirements
YG105 15000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 9/16" 2 1/16"
YG70 10000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 4 1/16" 3 1/16" 2 9/16" 2 1/16"
YG35 5000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16"
YG21 3000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16"
System Configuration
Complete assembly includes choke valves (manual, hydraulic, and positive types), gate valves, line pipes, fittings, pressure gauges, and related components for comprehensive pressure management.
Operating Principles
During pressure increases, the choke manifold regulates fluid release by adjusting choke valve positions. High casing pressure can be directly vented through gate valves, maintaining safe operating conditions throughout drilling operations.
Pressure Ratings
Available in multiple pressure ratings including 2000psi, 3000psi, 5000psi, 10000psi, and 15000psi, with custom configurations available upon customer request.
Installation & Operation Guidelines
  • All components must match BOP stack working pressure specifications
  • Install in easily accessible locations with pre-installation pressure testing
  • Maintain level, straight line pipes using 120-degree steel bends where necessary
  • Ensure proper pressure gauge installation for accurate monitoring
  • Suitable for low-temperature winter operations

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Hebei E-valves Petroleum Equipment Co., Ltd.
Location Xinhua District, Cangzhou City, Hebei Province, China
Contact Person David

Request A Quote

Please check your email address.
Your message must be at least 20 characters.