Hebei E-valves Petroleum Equipment Co., Ltd.
                                                                                                           
Verified Supplier
8 Years
Since 2018
Menu

2 9/16" 10000 PSI Choke & Kill Manifold for Oilfield Drilling Equipment - API 16C Compliant

Price Negotiable
Price: USD 50000-100000 per set
MOQ: 1 set
Delivery Time: 7 work days
Brand: Hebei Pantu
Product Description
2 9/16" 10000 PSI Choke & Kill Manifold

Professional oilfield drilling equipment designed for pressure control operations with API 16C compliance and multiple pressure rating options.

Technical Specifications
Main Parameters
  • Medium: Oil, Gas, Mud
  • PSL Rating: PSL1 to PSL4
  • Material Class: EE, FF, HH
  • Working Pressure: 2000, 3000, 5000, 10000, 15000 PSI
  • Master Bore: 2-1/16", 2-9/16", 3-1/8" (3-1/16"), 4-1/16"
  • Standard: Conforms to API 16C
Choke & Kill Manifold Models
Type Working Pressure (PSI) Main Bore Dia (In.) By-pass Dia (In.) Remarks
YG140 20000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 1/16" 2 9/16" Different types of combinations can be provided according to requirements
YG105 15000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 9/16" 2 1/16" Custom configurations available
YG70 10000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 4 1/16" 3 1/16" 2 9/16" 2 1/16" Standard configurations
YG35 5000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16" Standard configurations
YG21 3000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16" Standard configurations
System Configuration

The choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges, and other essential components for complete pressure control functionality.

Working Principles

When well pressure increases, operating the choke valves (manual, hydraulic, or positive chokes) on the manifold allows controlled fluid release to manage casing pressure. High casing pressure can be directly vented through gate valves for emergency situations.

Operating Instructions
  • All manifold components must have working pressure compatibility with the BOP stack
  • Install in easily accessible location with pre-installation pressure testing at rated working pressure
  • Ensure line pipes are level and straight, using 120-degree steel bent pipes for turns with adequate bore size
  • Pressure gauges must be properly installed and calibrated
  • Designed for operation in low-temperature winter conditions

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Hebei E-valves Petroleum Equipment Co., Ltd.
Location Xinhua District, Cangzhou City, Hebei Province, China
Contact Person David

Request A Quote

Please check your email address.
Your message must be at least 20 characters.