Hebei E-valves Petroleum Equipment Co., Ltd.
                                                                                                           
Verified Supplier
8 Years
Since 2018
Menu

Forged Double Ram Blowout Preventer With Shear Capacity Hydraulic Open And Close

Price Negotiable
Price: 10000USD
MOQ: 1 set
Delivery Time: 7 days
Brand: Shenkai
Product Description

13 5/8"-10000psi double ram blowout preventer, top and bottom flange (according to clients' requirements),Top cavity with tandem boosters are able to shear 5 1/2" S135 grade drill pipe, it meets NACE 0175, H2S Trim, Meet API 16A Latest edition, API Monogrammed. 

 

Technical Parameters of the Ram BOP(without tandem booster)

 

Item Single Ram Blowout Preventer

Double Ram Blowout

Preventer

Specification 13 5/8” - 10,000psi SR BOP 13 5/8”- 10,000psi DR BOP
Top Connection Studded Flanged Studded Flanged
Bottom Connection Flanged Flanged Flanged Flanged
Height H mm 850 1130 1415 1695
Weight

5767 ㎏

(12,816 lb)

6322 ㎏ (14,049 lb) 10955 ㎏ (24,344 lb) 11510 ㎏ (25,578 lb)
Bore Size 346. 1 mm (13 5/8″)
Hydrostatic test pressure 105MPa (15,000psi)
Rated working pressure 70 MPa (10,000psi)
Hydraulic Control System Strength Test pressure 31.5 MPa(4,500psi)
Hydraulic Control System Rated Working Pressure 21 MPa(3,000psi)
Recommended Hydraulic Control Operating Pressure 8.4~10 .5MPa(1,200~1,500psi)
Cylinder diameter 342.9mm(13 1/2″)
Opening chamber volume for one set of Ram 41L
Closing chamber volume for one set of Ram 43L
Thread of Hydraulic Port NPT 1

Specification of the Side

Outlet

4 1/16″- 10,000psi or according to the specific contract
Temperature Grade T20(-29~121℃) or according to the specific contract
Closure Ratio 10.83: 1
Ram sizes

Blind Ram; 2 3/8 ″ ,2 7/8 ″ ,3 1/2 ″ ,4 1/2 ″ ,5 ″ ,5 1/2 ″ ,7 ″ ,9 5/8 ″ ,9

7/8 ″ ,normal and H2S service shear ram ,4 ″, 10 3/4″, 7 5/8″, 6 5/8″, 7 1/2″,2 7/8″~5″,3 1/2″~5 1/2″,4 1/2″~7″, 2 3/8″ ~3

1/2″,3 1/2″~5 7/8″, 3 1/2″dual hole, 2 7/8″dual hole, 3 1/2″X2

7/8” dual hole.

Note:The same specification of Cameron Rams can be installed in the BOP. (Except shear ram)

Other Descriptions:

The designing and the manufacturing of the blowout preventer are in accordance with the API Spec 16A norms.

The resistance to the corrosive stress of hydrogen disulfide of the internal parts of the blowout preventer in contact with the well liquids conforms to the requirements specified in NACE MR-01-75.

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Hebei E-valves Petroleum Equipment Co., Ltd.
Location Xinhua District, Cangzhou City, Hebei Province, China
Contact Person David

Request A Quote

Please check your email address.
Your message must be at least 20 characters.