Hydro Horizontal Francis Water Turbine Generator ISO Certification
CustomizedHorizontalFrancis Water Turbine Hydro Turbine Generator for Hydropower Station on W2W Basis
|
Unit Capacity:
|
100kW-100MW
|
|
Applicable Water Head:
|
20m-500m
|
|
Winding Insulation Class:
|
F
|
|
Frequency:
|
50Hz or 60Hz
|
|
Rated voltage:
|
0.4/3.3/6.3/10.5/13.8KV etc.
|
|
Excitations:
|
SCR, Brushless
|
|
Service provided:
|
Equipment supply, Installation & commissioning, free training
|
|
Warranty Period:
|
2 Years
|
Company Information
What We Can Do For You:
Based on technical team members with abundant professional knowledge, rich practices & experiences in this specific industry, CSIC is focusing on special package solution design & supply of water turbine-generator sets and the auxiliaries according to the special working conditions of the certain power station. With plenty of industrial resources, CSIC has strategic alliances with several professional hydropower survey & design institutes, turbine-generator and auxiliary equipment manufacturers, working for customized proposals to customers' projects worldwide on "Water to Wire" basis, providing package solution, technical design and engineering supervision, E&M equipment supply, installation & commissioning services, free training, etc.
Our Main Products:
Francis, Kaplan, Pelton, Turgo, Tubular Turbine Generator Unit
Auxiliary Equipment:
Inlet valves (Hydraulic / electric control butterfly valves, ball valves, sluice valves), Governors, Excitations (SCR excitations, DC excitation systems, AC brushless exciters), MV/HV Switchgear, Oil pressure supply systems, control facilities, automatic control systems, Transformers, Power cable and so on.
Packaging & Shipping
Cooperated customers from overseas:
Until now, we have provided equipment & services to Indonesia, Russia, Belarus, Chile, Peru, Indonesia, Turkey, New Zealand, D.R. Congo, South Korea, Nepal, India, Pakistan, Philippines, etc.
FAQ
Q1: What kind of service could you offer?
A: We can offer design, manufacture, EPC, hydropower station investment, repair and maintenance, rehabilitation and spare parts supply for hydropower project from 200kW to 100MW.
Q2: I want to develop a hydropower station, could you help me to design it?
A: Yes. We could do EPC or E&M package solution. Please offer us the necessary files, information and data.
Q3: What parameters do I need to provide?
A: Normally we need water head, flow, install capacity, voltage, frequency and rotation speed, and also On-grid or Off-grid type option. (On-grid type voltage:____Kv)
Q4: Which countries have you ever exported to?
A: Russia, Belarus, Pakistan, India, Nepal, Philippines, South Korea, Chile, Peru, Indonesia, Turkey, New Zealand, D.R. Congo, etc.
Thanks for your time., For more details or any inquires, pls contact us for further support!!!
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.









