Buried Pipeline Demagnetizer 12Kw Demagnetize Pipe Equipment
Trace Heating System heating belt trace heating
INTRODUCTION
After the buried pipeline is cut for a long time, a relatively strong magnetic field will be generated at the nozzle, and the counterpart of the pipeline cannot be welded.
The pipe degausser is to wind the cable at the pipe mouth. According to the principle of electromagnetic induction, a magnetic field is temporarily formed at the pipe mouth after power-on.
The direction of the magnetic field is opposite to the direction of the pipeline magnetic field, so that the original magnetic field is temporarily offset and the welding proceeds smoothly.
Why choose suhigo?
1) Suhigo is professional manufacturer, obtained ISO9001, ISO14001, GB/T28001 HSE Certificates, and CE certificate.
2) Suhigo has rich project experience with CPP, CNPC and SINOPEC branch oil construction companies.
3) Pipelayer cabin can be provided with ROPS & FOPS certificates, for option.
4) Suhigo product has exported to Russia, Middle Asia, Middle East, Africa etc.
5) Suhigo factory covers 30,000m2 and has 100+ workers including office, workshop and field service personnel.
| Project Name | main parameters |
| Operating Voltage | 380V/50Hz |
| Power consumption | 12KW |
| Degaussing current | 2000A |
| Degaussing field | Port combination up to 550MT |
| Protection alarm function | include |
| Relative humidity | <95% |
| ambient temperature | -45℃~+60℃ |
| Dimensions | 500*400*450mm |
| Total Weight | 35KG |
About Suhigo
- As China Specialist in Pipeline Construction Equipment Manufacturing., Suhigo can offer premium pipelayers or sideboom to help achieve the target of lifting pipe, moving to position and placing pipe. Suhigo Pipelayer Family have full line lifting weight pipelayers equivalent to International Pipelayer brand, size ranging from 25tons to 90tons. With decades experience, all pipelayers are designed to full safety, reliable performance and easy operation, can work flexible with different size pipeline construction projects throughout the globle. Up to now, Suhigo have worked with Oil Construction companies of CNPC, Sinopec and CPP.
- Looking to acquire brand new pipelayers or sidebooms for your tender ? Check out the latest introduction of Pipelayers from Suhigo. Except for brand new pipelayers, we may have some used pipelayers in stock with good quality, welcome to contact us for more information.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
