Qingdao Xinguangzheng Global Engineering Co.,Ltd
                                                                                                           
Verified Supplier
Years
Since
Menu

A Steel Frame Under Construction

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: Negotiable
Product Description

ENTERPRISE MISSION: GIVE CLIENTS HAPPINES! Our company, Xinguangzheng (XGZ) Group, has six factories, a production area of 150,000 square meters, 16 million dollars in registered capital and a yearly production capacity 50,000 tons. Design - model - procurement - production - packaging -...

ENTERPRISE MISSION: GIVE CLIENTS HAPPINES!

Our company, Xinguangzheng (XGZ) Group, has six factories, a production area of 150,000 square

meters, 16 million dollars in registered capital and a yearly production capacity 50,000 tons.

Design - model - procurement - production - packaging - delivery - erection - after-sales for steel structure products will be supplied for you in one-stop service.

 

Brand nameXGZ
Place of OriginQingdao, China
Frame gradeQ355/Q235B/ASTM ETC.
Surface treatmentPaint/Hot dip galvanization
Products

Steel frame/crane/roof and wall panel/insulation/ window/door/skylight/

ventilation/ceiling/solar panel/Louver/Mezzanine/

curtain wall ETC. and Customized products

Delivery time20-60 days after shop drawing confirmed
Guarantee period5 years
Service life50 years
MOQ1,000 square meter

 

1

2


01 Material Entry

H-shaped steel plate should be inspected again after entering the factory, and can be used only after meeting the design and specification requirements. Lofting materials should be for the purpose of ensuring processing quality and saving materials. After setting out, it shall be inspected by inspectors to ensure the accuracy of geometric dimensions, geometric tolerances, angles and mounting contact surfaces of parts, components and members.

 

02 H Section assembly

The H section stands on the imported H section production line. Four hydraulic positioning systems secure the upper and lower flange plates and webs of the H-beam members for positioning.

03 Automatic welding

After H steel is assembled, it is hoisted into the gantry type submerged arc automatic welder for welding, and welding is carried out according to the specified welding sequence and welding specification parameters.

04 Straighten the flange

In one case, the flatness of the H steel wing plate is corrected using the H steel wing plate corrector. In special cases, the verticality of the H-steel fins and webs is corrected by flame, and the side-bending of H-steel is corrected by flame.

05 Assembling

Make the mold, finalize the design, and pass the relevant department review before assembly. After the first part is assembled, it should be inspected.

 


Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Qingdao Xinguangzheng Global Engineering Co.,Ltd
Location No.268, Shenzhen Road, Pingdu, Qingdao City, Shandong Province, China
Contact Person james

Request A Quote

Please check your email address.
Your message must be at least 20 characters.