Military Bailey Bridge Army Steel Temporary Bridge

Price Negotiable
Price: US $1800-2000/Tons
MOQ: 1PC
Delivery Time: Shipped in 30 days after payment
Brand: QHHK
Product Description

 Military Bailey Bridge Army Steel Temporary Bridge

 

 

About bailey bridge:Bailey bridge is used when there is a need to cross an obstacle for a certain time period.This is often in case of military operations, during or after natural disasters replacement or renovation of consistent bridges or in unusually areas like the movie industry. Thereby the function also differs on differs on different users of the bridge which could be pedestrians, common vehicles(cars,busses,trucks),heavy military equipment (tank) or the railway.

 

 

PRODUCT DETAILS

 

 

Type
Moudle
Lanes
width
Bridge Deck
Steel Grade
Corrosion
SS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q355
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
DS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q355
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
TS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q355
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
DD
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q355
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
TD
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q355
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461

 

 

FAQ

Q: What kind of company are you?
A: We are a specialized steel bailey bridge manufacturer with leading manufacturing process for steel bailey bridges in China, who has engaged in this line for over 22 years with an international Quality System Certification of ISO9001:2015 and as cooperation partner with the research institutions of the People's Liberation Army. In addition to this, have good market reputation overseas, like Nigera, Angola, Cango, Cambodia, Nepal, Venezuela, Vietnam, Bangladesh, Papua new guinea, Columbia......
-------------------------------------------------------------------------------------
Q: Are you a factory or a trade company ?
A: We are a factory with Six production lines and various machines to fabricate steel bridges parts and other steel structures. Also, we have gotten the exporting license to devote ourselves into global markets.
-------------------------------------------------------------------------------------
Q: How about quality control of your company?
A: We pay great attention on quality control from the beginning to the end,keeping our goods to meet the standards of CMA,CNAS,ISO9001,Grade I road,Grade A urban road,Amercia loading standard HS25 and British loading standard HA.
-------------------------------------------------------------------------------------
Q: Where is your loading port?
A: Any port in China, the main port is Dalian port .

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company QHHK Steel Structure
Location Room 415, A25 building SISP, Hunnan District, Shenyang, China
Contact Person petercheng

Request A Quote

Please check your email address.
Your message must be at least 20 characters.