OEM Precision Sheet Metal Fabrication Parts 14 Gauge Steel Electrical Straight Wiring Lay
Price:
USD 5-25/PCS
MOQ:
20 PCS
Delivery Time:
15-20 work days
Brand:
Chenyang
Product Description
14 Gauge Steel Electrical Straight Wiring Lay Precision Sheet Metal Fabrication Parts
Some steps in Metal sheet processing:
- Finishing:
- Surface treatments are applied to the sheet metal part to improve aesthetics, corrosion resistance, or other properties. Common finishing processes include:
- Painting or Powder Coating: For adding color and corrosion protection.
- Plating or Anodizing: For enhancing corrosion resistance and appearance.
- Deburring: Removing sharp edges or burrs from cut and formed edges.
- Polishing or Grinding: Smoothing the surface for a desired finish.
- Surface treatments are applied to the sheet metal part to improve aesthetics, corrosion resistance, or other properties. Common finishing processes include:
- Quality Control:
- The finished part is inspected to ensure it meets the specified dimensions, tolerances, and quality standards. Inspection methods may include visual inspection, measurement, and non-destructive testing.
- Packaging and Shipping:
- Once the sheet metal part passes quality control, it is packaged for shipping to the customer or assembly line.
- Documentation:
- Detailed documentation, including drawings, specifications, and quality records, is often provided to the customer to ensure traceability and quality control.
| Brand | Chenyang | |
| Our products | High-speed rail/ bullet train/ subway spare parts, Fitness/ massage equipment spare parts, Wind power accessories, Automobile / motorcycle spare parts, Solar street light spare parts, Telecommunication and security equipment spare parts, Water filter accessores, Plastic air filter spare parts, Fire Accessories etc, such as Sheet plate series, Cabinet Series,Die casting series, CNC machining series,Injection plastic series etc | |
| Place of Origin |
|
|
| Size | OEM Standard Size | |
| Surface | Matte or gloss or according to clent's requirement | |
| Process | die casting Cnc maching | |
| Available Materials | AL:5052/5754/5082/5083/6061/6063/6082…. ZL101/ZL102/ADC12… Carbon Steel: Q235B/Q345E/Q345D/SPCC/SECC/DX51D/DX53D… Stainless steel: 304/316/430/201... |
|
| Payment | T/T, L/C, Money Gram, Western Union | |
| Delivery | Sample: 3~5 days for no mould items and 7~10 days for mould items Mass goods: 15~20 working days |
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Qingdao Chenyang Machinery Mfg Co., Ltd.
Location
NO.5 Yunshui 2nd Road, Automobile Industry New Town, Jimo Dirstrict, Qingdao, China
Contact Person
Abby