Silkscreen Sheet Metal Fabrication Products Carbon Steel Hardware Stamping Parts
Price:
USD 0.5-20/PCS
MOQ:
20 PCS
Delivery Time:
15-20 work days
Brand:
Chenyang
Product Description
Stainless Steel Hardware Stamping Silkscreen Precision Sheet Metal Fabrication Parts
Several tests can be conducted to test the IP66 (Ingress Protection) rating:
- Dust Test (6): In accordance with the IP66 rating, the enclosure is subjected to a dust test to ensure it is dust-tight. This is typically done using a dust chamber and observing whether any dust particles penetrate the enclosure.
- Water Jet Test (6): The enclosure is subjected to powerful water jets from all directions to assess its resistance to water ingress. The test checks if the enclosure can withstand heavy splashing and exposure to water.
- Water Immersion Test (6): This test involves immersing the enclosure in water for a specified duration and depth to evaluate its ability to remain waterproof when submerged.
- Impact Test: To assess mechanical impact resistance, a test is performed where the enclosure is struck with a specified force and from different angles to simulate real-world conditions.
| Brand | Chenyang | |
| Our products | High-speed rail/ bullet train/ subway spare parts, Fitness/ massage equipment spare parts, Wind power accessories, Automobile / motorcycle spare parts, Solar street light spare parts, Telecommunication and security equipment spare parts, Water filter accessores, Plastic air filter spare parts, Fire Accessories etc, such as Sheet plate series, Cabinet Series,Die casting series, CNC machining series,Injection plastic series etc | |
| Place of Origin |
|
|
| Size | OEM Standard Size | |
| Surface | Matte or gloss or according to clent's requirement | |
| Process | die casting Cnc maching | |
| Available Materials | AL:5052/5754/5082/5083/6061/6063/6082…. ZL101/ZL102/ADC12… Carbon Steel: Q235B/Q345E/Q345D/SPCC/SECC/DX51D/DX53D… Stainless steel: 304/316/430/201... |
|
| Payment | T/T, L/C, Money Gram, Western Union | |
| Delivery | Sample: 3~5 days for no mould items and 7~10 days for mould items Mass goods: 15~20 working days |
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Qingdao Chenyang Machinery Mfg Co., Ltd.
Location
NO.5 Yunshui 2nd Road, Automobile Industry New Town, Jimo Dirstrict, Qingdao, China
Contact Person
Abby