Reention Dorado 36V 15Ah Li-ion E-Bike Battery with USB Port

Price Negotiable
Price: 88
MOQ: 5
Delivery Time: Negotiable
Product Description
Reention Dorado E-Bike Lithium Ion Battery 36V/48V 10Ah-17.5Ah
Product Specifications
Attribute Value
Model NO. TL-EB-D36/48
Battery Type Rechargeable Li-ion
Discharge Rate High Discharge Rate
Standard Voltage 48V
Rated Capacity >1000MAH
Transport Package Paper Box with PE Bag
Origin Shenzhen, China
Production Capacity 5000 units
Technical Details
Application Electric Bike/Scooter
Battery Type 18650 Rechargeable Li-ion
Capacity 15Ah (17.5Ah option available)
Voltage 36V/48V
Weight 4.5KG
Cycle Life 500-1000 Times
Size 460*80*73mm (370*90*110mm for 17.5Ah model)
Cell Combination 10S6P (13S5P for 17.5Ah model)
Product Features
  • 36V/48V capacity up to 17.5Ah (13S5P) with USB 2.0 port
  • Suitable for 1000W motor with max constant discharge current: 25A
  • Includes 54.6v 2A charger
  • Black color with LED power display
  • Improved Jumbo Shark case with ON/OFF switch
  • Built-in USB port for charging mobile devices
  • Key lock mechanism for secure mounting
  • Charging indicator (red light turns green when fully charged)
Product Images
Reention Dorado E-Bike Battery front view Reention Dorado E-Bike Battery side view Reention Dorado E-Bike Battery with USB port Reention Dorado E-Bike Battery display Reention Dorado E-Bike Battery packaging Reention Dorado E-Bike Battery dimensions Reention Dorado E-Bike Battery with charger Reention Dorado E-Bike Battery mounted on bike
Shipping Information

Items are shipped within 5-7 business days after payment clearance (excluding weekends).

Standard shipping via DHL, UPS, FedEx takes 3-7 business days.

Please ensure your shipping address is correct - we are not responsible for undeliverable addresses.

Local pickup is not available.

Quality Assurance

All batteries are 100% brand new with CE, UL, and ISO9001/9002 certifications.

1-year warranty against defects in materials and workmanship.

Manufacturer-direct pricing for both retail and wholesale customers.

Note: For first charge, please open the switch and charge for at least 8 hours until the charger light turns green.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen TL New Energy Co.,Ltd
Location 722-725 Room Global Logistic Building,No.1 South China Avenue, Pinghu Street, Longgang District,Shenzhen,China
Contact Person ZHOU

Request A Quote

Please check your email address.
Your message must be at least 20 characters.