Jiangsu Kaiyi Intelligent Technology Co., Ltd.
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu
Machinery Production line Food processing line

High Efficiency Mango Juice Processing Plant Line Automatic Grade

Price Negotiable
MOQ: 1 SET
Delivery Time: 3 Months
Brand: KAAE
Product Description

High Efficiency Mango Juice Processing Plant Line Automatic Grade


 

Characteristics of mango juice

1. The processing capacity is varied.
2. The line can deal with similar characteristic of fruits.
3. Using the high efficient of mango destoner to improve the mango output percentage effectively.
4. Using efficient belt juice extractor to improve the juice efficiency and the output percentage of pineapple.
5. The production process fully automatic PLC control to save labor and facilitate production management.
6. Low-temperature vacuum evaporation, maximize reserve the flavor substances and nutrients also save energy.
7. Tubular UHT sterilizer and aseptic filling machine, produce high-quality aseptic juice products.
8. Automatic CIP cleaning, ensure the entire line equipment of food hygiene and safety requirements.

 


Mango washing machine --Mango sorting machine---Brush washing machine--Belt sorting machine--Double stage pulping machine--Buffer tank--Homogenizer---Storage tank--Screw pump--Sterilization---Aseptic filling machine.

 

 

The End Products and Packaging Containers

 

-Concentrated mango pulp/puree filled into aseptic bags in drums or bag in box containers.
-Non-concentrated mango pulp/puree filled into aseptic bags in drums or bag in box containers.
-Blended mango juice filled into PET/glass bottles,small tin cans,tetra paks,cartons,or other small containers.
-NFC mango juice filled into PET/glass bottles,aseptic cartons.
-Dry Mango chips/slice filled into pouches or jars.

 

Technical data

processing fruit mango
capacity 0.5-120T/H, can be design as the client demand
material ss304,ss316
original jiangsu, China
MOQ 1 set
packing  export standard
payment T/T
voltage as the client local demand

 

 

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT.

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer
B.pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

5.Installation and maintenance:
A.The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Kaiyi Intelligent Technology Co., Ltd.
Location No.6 JinGui East Road, Hudai Industrial Park, Binhu District, Wuxi, Jiangsu Province , China
Contact Person Sophia

Request A Quote

Please check your email address.
Your message must be at least 20 characters.