Guangzhou XinFeng Engineering Machinery Co., Ltd.
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu

Excavator Sk75-8 Control Valves Main Control Valve for KOBELCO LG30V00001f1

Price Negotiable
Price: Negotiable
MOQ: 1 Sets
Delivery Time: 3-5 days
Brand: KOBELCO
Product Description

Excavator Sk75-8 Control Valves Main Control Valve for Kobel-Co LG30V00001f1 Excavator Parts

Product Descriptio

 

 


 

 
Maintenance

Replacing the distribution valve of a Hitachi excavator usually requires several steps to be followed. Here is a general guide to how to do it:

Steps
Preparation:
Make sure the excavator is in a stable state and turn off the engine.
Disconnect the power supply for safety.
Remove the old distribution valve:
Find the loion of the distribution valve, usually in the hydraulic system.
Use a wrench to remove the connected hydraulic pipe, pay attention to the possibility of hydraulic oil leakage, and prepare a cleaning cloth.
Remove the screws that fix the distribution valve and gently remove the old valve.
Install the new distribution valve:
Align the new distribution valve to the installation position, making sure the gasket is intact.
Test:
Start the excavator and check the operation of the distribution valve.
Make sure there is no oil leakage and observe whether all functions are normal.
 

 

About Xinfeng Machinery (XF) parts:
 

 
Excavator Spare Parts
 

Swing Motor Travel Motor Fan Motor
Swing Gearbox Travel Gearbox Relief Valve
Gear Pump Electrical Parts Distribution Valve
Engine Assembly Final Drive Assy Hydraulic Pump

 

 


 
Advantages

 
Warehouse Display

Packaging and Delivery
 

 
FAQ
1.How to quickly and accurately buy products what lneeded?
A:Provide the original parts number to us to check.
 
2.How long have you been in the excavator
A:We are engaged in excavator parts since 1998


3.lfI don't know the part number,what shouldI do?
A:Please send us size and pictures of old products.
 
4.What is the warranty of the products?
A:The warranty is 6/12 Months based on the specific product.


5.How long is your delivery time?
A:The normal delivery time is 3-5 days for stock sproductsafter getting payment. lf not in stock, we will inform you thetime requlred.
 
6.Which shipping term you can supply?

A:By sea,air or by express ( DHL,Fedex,TNT,UPSEMS)

 
7.What is your MOQ?
A:Small order and sample order are acceptable


8.Do you have any After-Sales service?
A:Yes!Our
 
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou XinFeng Engineering Machinery Co., Ltd.
Location GuangZhou,CHINA(No.D01,YingFeng building,No1190.Zhongshan avenue central,tianhe district,Guangzhou.)
Contact Person Kane

Request A Quote

Please check your email address.
Your message must be at least 20 characters.