Foshan Glawall Building Materials Co., Ltd
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

Aluminum Frame Glass Partition Wall System 90mm 108mm Thickness

Price Negotiable
Price: US$80.00 10 - 99 square meters
MOQ: 10 square meters
Delivery Time: 2-3 weeks
Brand: Glawall
Product Description
Double Layer Glass Wall - Super Noise Reduction for Office Partitions
Product Specifications
Attribute Value
Material Aluminum frame + glass panel
Transparency Clear
Customizable Size, accessories
Panel Thickness 90mm, 108mm
Glass Type Strong tempered glass
Frame Material Aluminum
Key Advantages Competitive price, professional service, quality guarantee
Double layer glass partition wall installation in office space
Customizable Office Partition Solutions
Our basic layouts can be customized to your exact dimensions, allowing you to create simple rooms or design entire floors of elegant glass office space. Mix and match different door types including sliding doors, with flexibility to finalize door positions during installation.
Premium Construction Features
All partitions feature toughened glass as standard (10mm or 12mm thickness depending on height), secured by slim powder-coated aluminum perimeter tracks for a frameless appearance. Includes single glazed frameless door with pull handles, with options for framed doors, lever/lock handles, sliding doors, and double doors.
Our frameless glazed partitions are securely fixed to existing walls and ceilings using durable aluminum framing. These glass walls and doors effectively divide workspaces while maintaining natural light flow and visual connectivity throughout your office. Complete installation service included with single door package.
Detailed view of glass partition wall components and structure
Professional Installation Process
  • Install top tracks or ceiling brackets for partition walls
  • Secure wall starter at one end of partition to floor and wall
  • Connect top tracks to ceiling ensuring level installation
  • Install and align bottom tracks with top tracks
  • Install corner poles where needed for structural support
  • Install horizontal panels into tracks ensuring proper alignment
  • Install vertical panels between horizontal panels
  • Connect panels together using secure connectors
  • Adjust vertical poles for perfect alignment
  • Ensure proper alignment with top and bottom grooves
  • Complete installation with finishing touches like blinds
Following manufacturer guidelines ensures optimal performance and longevity of your partition system.
Glass partition wall installation in progress showing track system
Production & Shipping Information
Standard production time: 3-4 weeks for quality manufacturing. We offer flexible shipping options:
  • EXW (Ex Works): Buyer responsible for transportation from our facility
  • FOB (Free on Board): Responsibility transfers when goods are loaded at departure port
  • CIF (Cost, Insurance and Freight): Includes goods, insurance, and freight to destination port
  • DDU (Delivered Duty Unpaid): Delivery to specified location without customs duties
  • DDP (Delivered Duty Paid): Complete delivery with all duties paid
Completed glass partition wall installation in modern office

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Foshan Glawall Building Materials Co., Ltd
Location The 3rd Workshop of Luzhaoxiang, Shatou Xiqiao Industrial Zone (New District), Jiujiang Town, Nanhai District, Foshan City, China
Contact Person Jake Sze

Request A Quote

Please check your email address.
Your message must be at least 20 characters.