CNAS Audio/video, information and communications technology equipment - Part 1: Security Require
Price:
100 USD
MOQ:
1 pcs
Delivery Time:
5-10 work days
Brand:
LCS
Product Description
Certification Introduction:
1.Disconnect device
IEC 62368-1:2014 ED2; IEC 62368-1:2018 ED3;
AS/NZS 62368.1:2022; AS/NZS 62368.1:2018; EN
62368-1:2014/A11:2017; BS EN 62368-
1:2014/A11:2017; EN IEC 62368-1:2020/A11:2020; BS
EN IEC 62368- 1:2020/A11:2020; UL 62368-1:2014
Ed.2; UL62368-1:2019 Ed.3;CSA C22.2 NO. 62368-
1:2019 Ed.3;GB4943.1-2022 Appendix L
2.Equipment with battery pack and its protection circuit
IEC 62368-1:2014 ED2; IEC 62368-1:2018 ED3;
AS/NZS 62368.1:2022; AS/NZS 62368.1:2018; EN
62368-1:2014/A11:2017; BS EN 62368-
1:2014/A11:2017; EN IEC 62368-1:2020/A11:2020; BS
EN IEC 62368- 1:2020/A11:2020; UL 62368-1:2014
Ed.2; UL62368-1:2019 Ed.3;CSA C22.2 NO. 62368-
1:2019 Ed.3;GB4943.1-2022 Appendix M
3.Electrochemical potential (V)
IEC 62368-1:2014 ED2; IEC 62368-1:2018 ED3;
AS/NZS 62368.1:2022; AS/NZS 62368.1:2018; EN
62368-1:2014/A11:2017; BS EN 62368-
1:2014/A11:2017; EN IEC 62368-1:2020/A11:2020; BS
EN IEC 62368- 1:2020/A11:2020; UL 62368-1:2014
Ed.2; UL62368-1:2019 Ed.3;CSA C22.2 NO. 62368-
1:2019 Ed.3;GB4943.1-2022 Appendix N
4.Measurement of creepage distances and clearances
IEC 62368-1:2014 ED2; IEC 62368-1:2018 ED3;
AS/NZS 62368.1:2022; AS/NZS 62368.1:2018; EN
62368-1:2014/A11:2017; BS EN 62368-
1:2014/A11:2017; EN IEC 62368-1:2020/A11:2020; BS
EN IEC 62368- 1:2020/A11:2020; UL 62368-1:2014
Ed.2; UL62368-1:2019 Ed.3;CSA C22.2 NO. 62368-1:2019 Ed.3;GB4943.1-2022 Appendix O
5.Safety protection to prevent the entry of conductive objects
IEC 62368-1:2014 ED2; IEC 62368-1:2018 ED3;
AS/NZS 62368.1:2022; AS/NZS 62368.1:2018; EN
62368-1:2014/A11:2017; BS EN 62368-
1:2014/A11:2017; EN IEC 62368-1:2020/A11:2020; BS
EN IEC 62368- 1:2020/A11:2020; UL 62368-1:2014
Ed.2; UL62368-1:2019 Ed.3;CSA C22.2 NO. 62368-
1:2019 Ed.3;GB4943.1-2022 Appendix P
6.Circuits intended for interconnection with building wiring
IEC 62368-1:2014 ED2; IEC 62368-1:2018 ED3;
AS/NZS 62368.1:2022; AS/NZS 62368.1:2018; EN
62368-1:2014/A11:2017; BS EN 62368-
1:2014/A11:2017; EN IEC 62368-1:2020/A11:2020; BS
EN IEC 62368- 1:2020/A11:2020; UL 62368-1:2014
Ed.2; UL62368-1:2019 Ed.3;CSA C22.2 NO. 62368-
1:2019 Ed.3;GB4943.1-2022 Appendix Q
7.Heat and flame resistance tests
IEC 62368-1:2014 ED2; IEC 62368-1:2018 ED3;
AS/NZS 62368.1:2022; AS/NZS 62368.1:2018; EN
62368-1:2014/A11:2017; BS EN 62368-
1:2014/A11:2017; EN IEC 62368-1:2020/A11:2020; BS
EN IEC 62368- 1:2020/A11:2020; UL 62368-1:2014
Ed.2; UL62368-1:2019 Ed.3;CSA C22.2 NO. 62368-
1:2019 Ed.3;GB4943.1-2022 Appendix S
8.Mechanical strength test
IEC 62368-1:2014 ED2; IEC 62368-1:2018 ED3;
AS/NZS 62368.1:2022; AS/NZS 62368.1:2018; EN
62368-1:2014/A11:2017; BS EN 62368-
1:2014/A11:2017; EN IEC 62368-1:2020/A11:2020; BS
EN IEC 62368- 1:2020/A11:2020; UL 62368-1:2014
Ed.2; UL62368-1:2019 Ed.3;CSA C22.2 NO. 62368-
1:2019 Ed.3;GB4943.1-2022 Appendix T
9.Confirmation of accessible parts
IEC 62368-1:2014 ED2; IEC 62368-1:2018 ED3;
AS/NZS 62368.1:2022; AS/NZS 62368.1:2018; EN
62368-1:2014/A11:2017; BS EN 62368-
1:2014/A11:2017; EN IEC 62368-1:2020/A11:2020; BS
EN IEC 62368- 1:2020/A11:2020; UL 62368-1:2014
Ed.2; UL62368-1:2019 Ed.3;CSA C22.2 NO. 62368-
1:2019 Ed.3;GB4943.1-2022 5.3.2
10.Limits for electrical energy source ES1 or ES2
IEC 62368-
1:2014 ED2; IEC 62368-1:2018 ED3; AS/NZS
62368.1:2022; AS/NZS 62368.1:2018; EN 62368-
1:2014/A11:2017; BS EN 62368-1:2014/A11:2017; EN
IEC 62368-1:2020/A11:2020; BS EN IEC 62368-
1:2020/A11:2020; UL 62368-1:2014 Ed.2; UL62368-
1:2019 Ed.3;CSA C22.2 NO. 62368-1:2019 Ed.3;GB4943.1-2022 5

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shenzhen LCS Compliance Testing Laboratory Ltd.
Location
101, 201 Building A and 301 Building C, Juji Industrial Park, Yabianxueziwei Shajing Street, Baoan District, Shenzhen, 518000, China
Contact Person
Edison Xia