Fabrication Services Sheet Metal Fabrication

OEM Custom Thin Aluminum Sheet Metal Welding Services

Price Negotiable
Price: USD,0.65-9.76,Piece/Pieces
MOQ: 1,Piece/Pieces
Delivery Time: 3-7 days for sample order, 10-15 days for bulk order after
Brand: HS
Product Description

OEM Custom Sheet Metal Welding Product

 

 

Welded Component Description:

  1. Welded components are integral parts of various industries, joining metal pieces together through the process of welding.

  2. Welding involves melting and fusing the metal surfaces, creating a strong and durable bond.

Processing
Stamping, Deep drawing, Laser cutting,Bending, Welding, Drilling, Grinding, Spinning,CNC etc
 
 
 
Materials
Aluminum: 2000 series, 6000 series, 7075, 5052, etc.
Stainless steel: SUS303, SUS304, SS316, SS316L, 17-4PH, etc.
Steel: 1214L/1215/1045/4140/SCM440/40CrMo, etc.
Brass: 260, C360, H59, H60, H62, H63, H65, H68, H70, Bronze, Copper
Titanium: Grade F1-F5
 
Surface Treatment
Anodized, Bead Blasted, Silk Screen, PVD Plating, Zinc/Nickel/Chrome/Titanium Plating, Brushing, Painting, Powder Coated,
Passivation, Electrophoresis, Electro Polishing, Knurl, Laser/Etch/Engrave etc.
Quality Assurance
ISO9001:2015
Tolerance
+/-0.002~+/-0.005mm

 

 

Our advantage:

  1. Timely reply: Reply within 2 hours, TM reply within 30 minutes;
  2. More than 13 years of experience in the field of metal product processing and advanced processing machinery saving materials;
  3. 100% QC quality inspection before shipment;
  4. On-time delivery: 3-5 days for sample order and 10-15 days for bulk order after order confirmed

​FAQ:

Q1. Our warehousing ability?
A. Our own storage provides 10 days of stacking

 

Q2: How do I get a quote?
A: We need at least a PDF drawings, but please note 2D drawings are not adequate for quoting or making parts. 3D drawings in IGES (.igs), STEP (.stp) format be provided will be better!

 

Q3: What is your MOQ?
A: MOQ depends on our client's needs, besides,we welcome trial order before mass-production.

 

Q4: Is it possible to know how is myproduct going on without visiting your company?
A: We will offer a detailed products schedule and send weekly reports with digital pictures and videos which show the machining progress.

 

Q5:What's the production time for new molds and mass production?
A:10-20 days to make the new moulds, mass production takes around 15 days,can process urgently if need.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen Hongsinn Precision Co., Ltd.
Location Guangdong Shenzhen Baoan 1st & 2nd Floor, No. 3, Gangzai Street, Furong Industrial Zone, Xiangshan Community, Xinqiao Street,
Contact Person xiao

Request A Quote

Please check your email address.
Your message must be at least 20 characters.