Modular Cleanrooms Achieve 98% Material Reuse For Relocation Projects

Price Negotiable
Price: negotiate
MOQ: 1
Delivery Time: 18days
Brand: ZJNF
Product Description

I. Core Design Process

  1. Requirement Planning & Spatial Layout

    • Define cleanliness class (ISO Class 3 to Class 8) and temperature/humidity precision (±0.1°C/±1% RH)
    • Zone functional areas: personnel purification (air showers), material transfer (pass-through windows), core production zones; optimize personnel/material flows to prevent cross-contamination
    • Reserve equipment interfaces: pre-plan equipment locations, electrical conduits, and control system wiring
  2. Structural System Design

    • Framework Selection‌: Aluminum profiles (lightweight) or SUS304 stainless steel (corrosion-resistant) with electrostatic anti-dust coating
    • Enclosure System‌:
      • Walls: Powder-coated steel/stainless steel panels with sealed joints (Class 100 zones require R50mm curved corners to prevent dust accumulation)
      • Viewing windows: Double-glazed tempered glass for visibility and airtightness
    • Floor Treatment‌: Epoxy resin/PVC flooring (chemical-resistant, anti-slip); raised floor return air systems for high-cleanliness zones
  3. Aerodynamic Configuration

    Element Technical Requirements
    FFU Layout 100% ceiling coverage for Class 100 zones; Class 10,000 zones require ≥25 air changes/hour
    Filtration System HEPA+ULPA combination (efficiency ≥99.99%@0.3μm); UV sterilization for Grade A/B zones
    Pressure Control Maintain 10–15Pa gradients (highest positive pressure in core zones) with smart dampers
  4. Smart Control System

    • 10-inch touchscreen for real-time monitoring of particle count/temperature/humidity/pressure with threshold alarms
    • IoT platform for remote adjustment of HVAC/lighting/FFU speed, reducing energy consumption by 20–30% vs. traditional systems

II. Key Construction Specifications

  1. Factory Prefabrication Stage

    • Dust-free production of modular components (wall panels/FFUs/piping) with pre-installed electrical interfaces
    • Strict QC: Air-tightness testing (≤0.01% leakage rate), material corrosion resistance verification
  2. On-Site Installation Essentials

    • Foundation preparation: Floor flatness tolerance ≤2mm/2m with moisture barrier
    • Building-block assembly:
      Non-disruptive construction: No on-site cutting permitted; 500 m² basic module assembly within 48 hours
      
  3. Validation Standards

    • Dynamic testing: Continuous 72-hour viable particle monitoring (≤1 cfu/m³ for ISO Class 5 zones)
    • Airflow visualization: Smoke tests to confirm ≤0.1% dead zones

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen Zhong Jian South Environment Co., Ltd.
Location 9th Floor, Block C, Coolpad Building, Intersection Of Keyuan Avenue And Baoshen Road, Nanshan Gaoxin North District, Songpingshan Community, Xili Street, Shenzhen city, Guangdong, China
Contact Person Serena

Request A Quote

Please check your email address.
Your message must be at least 20 characters.