High-Pressure Foaming Machine Pre-Insulated Pipe Production Line with Sa2.5 Rust Removal and 206mm-1820mm Steel Pipe Coverage
PU Foaming Spary Pre-insulated Pipe Continuous Production Line
1. Pipe structure
Our company independently developed the spray winding insulation pipe production line, which consists of three parts: shot blasting and rust removal production line, polyurethane spraying production line, and PE winding production line.
2. Production line parameters:
(1) Steel pipe coverage: 206mm-1820mm
(2) Processing capacity: ≤250m2/h
(3) Cleaning level: Sa2.5
(4) Materials used: Black material (isocyanate), white material (combined polyether), polyethylene
(5) Main equipment: Shot blasting and rust removal production line, polyurethane spraying production line, PE winding production line, consisting of three parts
3. Technological flow:


PU Foaming spary Preinsulation Pipe Continuous Production Line
PUF spray PE winding preinsulated pipe production line consists of the following parts:
3) Polyethylene sheet extruding winding line
4) Water cooling line
5) End-cutting equipment
Main line Composition of the polyurethane coating steel preinsulated pipe equipment:
| No. | name |
| 1 | External wall Shot blasting rust removel machine |
| 2 | Medium-frequency induction heating furnace |
| 3 | Polyurethane spray foaming unit |
| 4 | pipe rotator trolley |
| 5 | Single screw extruder and diehead mould |
| 6 | Finished pipe ends trimming machine |
| 7 | pipe Conveyers and racks |
| 8 | Electrical system and PLC |
Production line equipment Photos show
Rust Removal
PE film jacket wrapping
PE Jacket Water quenching
Welcome to our factory to discuss cooperation!
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.



