2LPE Coating Line for Steel Pipe Manufacturing with 57-3000 mm Range, Powder Coating, and 1-6 m/Min Velocity
The 2PE (Two-Layer Polyethylene) coating system is a highly reliable anti-corrosion solution designed to protect steel pipelines used in oil, gas, water, and industrial applications. This system combines the strong adhesion of Fusion Bonded Epoxy (FBE) with the mechanical protection of a polyethylene outer layer, ensuring long-term durability and resistance against harsh environmental conditions.
2PE coating is widely used for buried and offshore pipelines, offering excellent corrosion resistance, impact strength, and cost-effective performance.
The 2PE system consists of two functional layers:
- First Layer - FBE (Fusion Bonded Epoxy): Applied directly to the cleaned steel surface, provides excellent adhesion and corrosion resistance, acts as the primary anti-corrosion barrier.
- Second Layer - Polyethylene (PE): Extruded over the FBE layer, offers mechanical protection and water resistance, enhances impact strength and durability.
- Excellent corrosion resistance
- Strong adhesion to steel surface
- High mechanical strength and impact resistance
- Good chemical and moisture resistance
- Cost-effective solution compared to 3-layer systems
- Long service life in harsh environments
- Oil & gas transmission pipelines
- Water supply pipelines
- Industrial pipeline systems
- Underground and offshore projects
Upload pipes → Pipes Conveyor → Rust Removal by Shot-blasting → Intermediate Frequency Heating → Epoxy Powder Coating → Polyethylene Wrap → Water cooling → Pipe Edge Beveling → Unload pipes.
- Surface Preparation (Shot Blasting): Steel pipes are cleaned using abrasive blasting to remove rust, oil, and contaminants, achieving the required surface roughness.
- Induction Heating: Pipes are heated to the optimal temperature (typically 180-250°C) to ensure proper adhesion of the FBE layer.
- FBE Powder Application: Epoxy powder is electrostatically sprayed onto the heated pipe, forming a uniform anti-corrosion layer.
- Polyethylene Extrusion Coating: A layer of molten polyethylene is extruded and wrapped around the pipe, bonding firmly with the FBE layer.
- Cooling System: The coated pipe is cooled using water or air cooling systems to solidify the coating.
- Inspection and Testing: Quality checks such as thickness measurement, adhesion testing, and holiday detection are conducted.
| No. | Name | Set |
|---|---|---|
| A. Derusting Equipment | ||
| 1 | Pipe-conveying Equipment | 1 |
| 2 | Shot Blast Cleaning Machine | 1 |
| 3 | Cyclone Dust Collector | 1 |
| 4 | Pulse dust collector | 1 |
| 5 | Centrifugal exhaust fan | 1 |
| 6 | Rust removal equipment PLC | 1 |
| B. Coating Equipment | ||
| 1 | Coating transfer equipment | 1 |
| 2 | IF heating device | 1 |
| 3 | Powder spraying device | 1 |
| 4 | Automatic loading dryer | 2 |
| 5 | SJ-180/30 Extruder | 1 |
| 6 | PE sheet extruder head mold | 1 |
| 7 | PE sheet coating device | 1 |
| 8 | Environmental Protection Ventilation equipment | 1 |
| 9 | Cooling Spray equipment | 1 |
| C. Platform Equipment | ||
| 1 | Steel pipe platform | 1 |
| 2 | Post-rust removal transition platform | 1 |
| 3 | Product tube storage platform | 1 |
| 4 | Hydraulic Equipment | 3 |
| D. Groove Equipment | ||
| 1 | PE Beveling Machine | 2 |
| 2 | Hydraulic Lifting and Turning Machinery | 1 |
| 3 | Hydraulic Equipment | 1 |
| 4 | PLC | 1 |
| E. Compressed Air Equipment | ||
| 1 | Screw Air Compressor | 1 |
| 2 | Cold dry machine | 1 |
| 3 | Precision filters | 3 |
| 4 | Gas tanks | 1 |
Qingdao Huashida Machinery Co., LTD is a manufacturer of series of plastic pipe machines, municipal pipe machines, pipe insulation & anticorrosion machines, and pipe jointing & anticorrosion materials, with more than 20 years of production experience.
- HDPE jacket pipe for pre-insulated pipe Production Line (110-2000mm)
- Rigid pre-insulated pipe Production Line
- Flexible pre-insulated pipe (PERT) production line
- Steel pipe FBE/2LPE/3LPE anti-corrosion coating line
- Steel pipe derusting line
- PE pressure pipe/Water Gas supply pipe production line
- PP/PE plastic board/sheet/geomembrane production line
- NBR PVC Thermal insulation tube/plate production line
- Pipeline anti-corrosion materials and instruments: heat shrink joint coating sleeve, electro-fusion weldable joint sleeve, portable welding gun (extruder), PE PP welding rod
We are always attach great importance to research and development, collaborating closely with Tsinghua University, Beijing University of chemical technology, South China university of technology and scientific research institutions. By absorbing advanced technology home and abroad, we now rank one of the top 3 manufacturers in the industry in China.
We have been working with more than 400 overseas customers and exporting our products to Kazakhstan, Uzbekistan, Middle East, Russia, Nigeria and more countries.
Thank you for your interest in Qingdao Huashida Machinery Co., Ltd. equipment.
For further details, please feel free to contact us at any time. Our team will respond promptly and provide a fully customized solution tailored to your specific requirements and project needs.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.