Customized Steel Cable Suspension Bridge with Hot-Dip Galvanized Surface - 10m to 300m Spans, AASHTO HL93 Loading
Price:
1000USD ~ 2000USD Per ton
MOQ:
negotiation
Delivery Time:
negotiation
Brand:
EVERCROSS
Product Description
Customized Steel Cable Suspension Bridge
Our cable-stayed bridges feature hot-dip galvanized surface protection for enhanced durability and corrosion resistance. These structural systems consist of three main components: main beam, cable tower, and stay cables.
Bridge Components & Structure
The cable-stayed bridge efficiently transfers loads from the main beam to cable towers through stay cables, then to the foundation. This design significantly reduces bending moments in the main beam, allowing for smaller beam dimensions and increased span capacity.
Span Layout Options
- Twin Tower Three-Span: Ideal for crossing larger rivers with main spans typically 200-500 meters
- Single Tower Double-Span: Suitable for small to medium rivers and urban channels with spans 100-300 meters
- Multi-Tower Systems: Three-tower four-span and multi-tower configurations for specialized applications
Applications
- Highway and railway cable-stayed bridges
- High-speed rail bridge applications
- Urban infrastructure and river crossings
Technical Specifications
| Parameter | Specification |
|---|---|
| Design Spans | 10m to 300m single span |
| Carriage Way | Single lane, double lanes, multilane, walkway |
| Loading Capacity | AASHTO HL93, HS15-44, HS20-44, HS25-44, NATO STANAG MLC80/MLC110 |
| Steel Grade | EN10025 S355JR, ASTM A572 GR50/GR65, GB1591 GB355B/C/D |
| Galvanization | Hot-dip galvanized per ISO1461, ASTM-A123 standards |
| Certifications | ISO9001, ISO14001, ISO45001, EN1090 |
Key Advantages
- Structural efficiency with optimized load distribution
- Enhanced corrosion resistance with hot-dip galvanization
- Construction flexibility with multiple erection methods
- Resilience to high winds, seismic activities, and natural forces
- Customizable designs for specific project requirements
- Proven performance in various environmental conditions
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO.,LTD.
Location
ROOM 403,NO.2 BUILDING,NO.269 TONGXIE ROAD,CHANGNING DISTRICT,SHANGHAI,CHINA
Contact Person
Libby Chen