Construction & Real Estate Metal Building Materials

Emergency Mechanized Bridge with 19m Span and 60-Ton Load Capacity for Disaster Response Infrastructure

Price Negotiable
Price: 1000USD ~ 2000USD Per ton
MOQ: negotiation
Delivery Time: negotiation
Brand: Evercross
Product Description
Emergency Mechanized Bridge Overview
The emergency mechanized bridge system combines a deployable bridge structure with a specialized erecting vehicle, delivering rapid deployment capabilities for critical infrastructure restoration in disaster scenarios.
Key Technical Specifications
Parameter Specification
Maximum Span 19 meters
Passable Width 3.3 meters
Maximum Load Capacity 60 tons (crawler vehicles)
Maximum Speed 80 km/h
Operation Crew 2 operators (remote control)
Core Features & Capabilities
  • Vehicle-bridge integrated structure for rapid deployment to disaster sites
  • Remote-controlled operation by two personnel for enhanced safety
  • Adjustable bridge deck height for versatile terrain adaptation
  • Compatibility with other bridge equipment systems
  • Self-propelled and self-withdrawal functionality
  • High-strength construction supporting 60-ton loads
Emergency mechanized bridge deployed over water obstacle Close-up view of mechanized bridge structure and components Emergency bridge erecting vehicle in transport configuration Mechanized bridge supporting heavy vehicle traffic Bridge deployment sequence showing extension mechanism
Primary Applications
This emergency bridge system is engineered for rapid response scenarios where conventional infrastructure has been compromised or is unavailable.
  • Earthquake disaster response for restoring access to epicenter areas
  • Crossing small-to-medium rivers, dry ditches, and swamp terrain
  • Emergency rescue operations following bridge damage or road washouts
  • Military and civilian support for overcoming natural obstacles
Operational Advantages
Enhanced Safety & Reliability
Mechanized operations minimize personnel exposure in hazardous environments while high-strength materials ensure structural integrity under demanding conditions.
Environmental Efficiency
Rapid deployment reduces energy consumption and environmental impact compared to traditional bridge construction methods.
Mobility & Flexibility
Self-propelled design enables direct site access without additional transport equipment, while quick withdrawal capability facilitates rapid redeployment to subsequent emergency locations.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO.,LTD.
Location ROOM 403,NO.2 BUILDING,NO.269 TONGXIE ROAD,CHANGNING DISTRICT,SHANGHAI,CHINA
Contact Person Libby Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.