Emergency Mechanized Bridge System - 60 Ton Load Capacity, 15m Span, Rapid Deployment for Disaster Relief
Price:
1000USD ~ 2000USD Per ton
MOQ:
negotiation
Delivery Time:
negotiation
Brand:
Evercross
Product Description
Emergency Mechanized Bridge System
The Emergency Mechanized Bridge is a specialized rescue system combining bridge components with an erecting vehicle, designed for rapid deployment in disaster scenarios. This self-propelled equipment enables quick bridge installation across spans up to 19 meters with passable width of 3.3 meters, supporting vehicles with maximum crawler loads of 60 tons.
Key Advantages
Enhanced Safety & Reliability
Mechanized operations significantly reduce personnel exposure in hazardous environments, minimizing risks to rescue workers during emergency deployments.
Operational Efficiency
High mechanization degree enables rapid installation and withdrawal, with single span setup completed in 9-11 minutes and full 75-meter deployment in 55-65 minutes.
Mobility & Flexibility
Vehicle-bridge integrated design allows for immediate deployment to disaster sites, featuring "bridge-on-vehicle" capability with maximum road speed of 80 km/h.
Technical Specifications
| Parameter | Specification |
|---|---|
| Gross Weight | 30.6 tons |
| Shipping Dimensions | 11600mm × 3200mm × 3700mm |
| Design Span | Single span 15m, unlimited continuous length |
| Design Load Capacity | Crawler load 60 tons, wheeled axial load 13 tons |
| Bridge Deck | Steel bridge deck, width 3.8 meters |
| Obstacle Clearance | Maximum depth 5.5m, adaptive flow rate 2m/s |
| Bridge Height Adjustment | 3.32-5 meters |
| Operational Crew | Single span: 7 people, full set: 12 people |
Primary Applications
- Earthquake disaster response for damaged road bridges and infrastructure
- Crossing small to medium rivers, dry trenches, and swamp terrain
- Emergency rescue operations following bridge damage or road washouts
- Ensuring passage for rescue teams and heavy equipment to disaster epicenters
Rapid Deployment Capability: This mechanized bridge system can be quickly transferred between rescue sites, restoring critical transportation lifelines within minutes to support disaster relief operations.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO.,LTD.
Location
ROOM 403,NO.2 BUILDING,NO.269 TONGXIE ROAD,CHANGNING DISTRICT,SHANGHAI,CHINA
Contact Person
Libby Chen