ISO228 Standard Brass Gas Valve with Plastic Sleeve Handle - 1/2 Inch Male Thread, 5 Bar Pressure Rating, 10,000 Cycle Durability
ISO228 standard brass gas valve featuring a durable plastic sleeve handle, designed for reliable performance in gas distribution systems with 1/2 inch male connection thread.
| Working Pressure | 5 Bar (72.5 PSI) |
| Working Temperature | -10℃ to 80℃ (14℉ to 176℉) |
| Thread Standard | ISO228 (equivalent to DIN 259 and BS2779) |
| Opening/Closing Cycles | 10,000 times tested |
- Brass Body: High-density forging, manufactured using precision CNC machines for leak-free performance and corrosion resistance
- Brass Bonnet: High-density forging construction ensuring no blisters or air holes
- Valve Ball: Smooth surface with excellent wear resistance and superior sealing performance
- Brass Valve Stem: Hot-rolled brass construction providing high strength and long-term durability
- Ball Seat: Pure PTFE (polytetrafluoroethylene) material offering high elasticity and wear resistance
- Handle: Aluminum alloy T-handle with professional surface coating for corrosion resistance and smooth operation
- O-ring: NBR & FKM materials with low friction coefficient for extended service life
- Stainless Steel Locknut: Internal anti-loosening design for long-term reliability
Complete product customization available to meet specific application requirements and project specifications.
Taizhou Yuehao Technology Co., Ltd. is located in Qinggang Industrial City, Yuhuan City, Zhejiang Province, in the central part of China's Golden Coast and the southern wing of the Yangtze River Delta Economic Circle. The company currently covers an area of 10,000 square meters and employs over 100 skilled professionals. As a specialized valve manufacturer, we integrate research and development, production, and sales operations.
We offer a five-year guarantee with comprehensive after-sales support.
No minimum order quantity required. We maintain substantial inventory for immediate shipment.
Both OEM and ODM services are available.
For stocked items: immediate shipment. For mass production: 30-45 days with our automated 24-hour production capabilities.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.